ITAC Assessment: LL0188
ITAC logo
ITAC Assessment: LL0188
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product Oil and Gas field equipment
NAICS 333132: Oil and Gas Field Machinery and Equipment Manufacturing
SIC 3533: Oil and Gas Field Machinery and Equipment
Sales Range $10
M
to 50
M
# of Employees 50
Plant Area 45,000
ft2
Annual Production 24
pieces
Production Hrs. Annual 6,240
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $95,339 1,725,289
kWh
Electricity Demand $32,130 5,691
kW-mo/yr
Electricity Fees $10,548 -
Natural Gas $60,436 9,363
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $84,346 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $37,447

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Ancillary Material Cost Savings
01 2.7131: Add area lighting switches $37,447 $4,522 - - - $37,447
-
MMBtu
-
02 2.4133: Use most efficient type of electric motors $24,382 $3,930 $22,513
407,400
kWh
- $1,869 - -
03 2.7111: Reduce illumination to minimum necessary levels $8,505 $575 $6,565
118,797
kWh
$1,288
-
kW-mo/yr
$652 - -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,939 $2,840 $3,637
65,823
kWh
- $302 - -
05 2.4231: Reduce the pressure of compressed air to the minimum required $3,428 $30 $2,148
38,876
kWh
$1,017
-
kW-mo/yr
$263 - -
06 2.7132: Install timers on light switches in little used areas $1,554 $480 $1,435
25,965
kWh
- $119 - -
07 2.7134: Use photocell controls $1,473 $510 $1,360
24,619
kWh
- $113 - -
08 2.7132: Install timers on light switches in little used areas $1,118 $48 $1,032
18,670
kWh
- $86 - -
09 4.611: Begin a practice of predictive / preventative maintenance $2,500 $60 - - - - $2,500
TOTAL RECOMMENDED $84,346 $12,995 $38,690
700,150
kWh
$2,305
-
kW-mo/yr
$3,404 $37,447
-
MMBtu
$2,500
TOTAL IMPLEMENTED $37,447 $4,522 - - - $37,447
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs