| Assessment Year | 1986 |
|---|---|
| Principal Product | PRINTED BUSINESS FORMS |
| NAICS |
n/a
|
| SIC | 2761: Manifold Business Forms |
| Sales Range | $5 M to 10M |
| # of Employees | 85 |
| Plant Area |
n/a
|
| Annual Production | 2,880
ton
|
| Production Hrs. Annual | 4,160
hrs
|
| Location (State) | Colorado |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $68,237 | 1,182,005 |
kWh
|
$0.058 |
| Natural Gas | $21,040 | 4,553 |
MMBtu
|
$4.62 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $13,345 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $4,634 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.7229: Air condition only space necessary | $6,836 | $6,420 |
$6,836
118,406
kWh
|
- | |
| 02 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $1,404 | $2,400 |
$1,404
24,326
kWh
|
- | |
| 03 | 2.4312: Improve lubrication practices | $1,726 | - |
$1,726
29,894
kWh
|
- | |
| 04 | 2.3191: Use demand controller or load shedder | $895 | $900 |
$895
-
kWh
|
- | |
| 05 | 2.4221: Install compressor air intakes in coolest locations | $558 | $200 |
$558
9,672
kWh
|
- | |
| 06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $491 | $150 |
$491
8,499
kWh
|
- | |
| 07 | 2.7228: Avoid introducing hot, humid, or dirty air into hvac system | $68 | $25 |
$68
1,172
kWh
|
- | |
| 08 | 2.7492: Use proper thickness of insulation on building envelope | $471 | $975 | - |
$471
-
MMBtu
|
|
| 09 | 2.6218: Turn off equipment when not in use | $372 | $200 |
$372
6,448
kWh
|
- | |
| 10 | 2.6124: Establish equipment maintenance schedule | $118 | $100 |
$118
2,052
kWh
|
- | |
| 11 | 2.7111: Reduce illumination to minimum necessary levels | $406 | $158 |
$406
7,034
kWh
|
- | |
| TOTAL RECOMMENDED | $13,345 | $11,528 |
$12,874
207,503
kWh
|
$471
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $4,634 | $1,733 |
$4,634
64,771
kWh
|
- | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs