Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product Raw sugar
NAICS 311314: Cane Sugar Manufacturing
SIC 2061: Cane Sugar, Except Refining
Sales Range $5
M
to 10
M
# of Employees 62
Plant Area 516,000
ft2
Annual Production 25,000,000
lb
Production Hrs. Annual 4,416
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $394,173 6,201,600
kWh
Electricity Demand $3,414 14,784
kW-mo/yr
Electricity Fees $15,600 -
Natural Gas $1,133,742 251,023
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $167,997 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $42,479

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Personnel Changes Savings
01 2.2441: Preheat boiler makeup water with waste process heat $124,711 $98,000 - - - $124,711
-
MMBtu
-
02 2.2135: Repair and eliminate steam leaks $37,488 $4,840 - - - $37,488
-
MMBtu
-
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,776 $3,200 $2,672
42,036
kWh
- $104 - -
04 2.7134: Use photocell controls $715 $45 $673
10,584
kWh
$15
-
kW-mo/yr
$27 - -
05 2.2511: Insulate bare equipment $492 $565 - - - $492
-
MMBtu
-
06 2.7135: Install occupancy sensors $315 $90 $294
4,625
kWh
$9
-
kW-mo/yr
$12 - -
07 4.611: Begin a practice of predictive / preventative maintenance $1,500 $60 - - - - $1,500
TOTAL RECOMMENDED $167,997 $106,800 $3,639
57,245
kWh
$24
-
kW-mo/yr
$143 $162,691
-
MMBtu
$1,500
TOTAL IMPLEMENTED $42,479 $8,145 $3,345
52,620
kWh
$15
-
kW-mo/yr
$131 $37,488
-
MMBtu
$1,500
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs