Assessment Year | 2004 |
---|---|
Principal Product | Raw sugar |
NAICS | 311314: Cane Sugar Manufacturing |
SIC | 2061: Cane Sugar, Except Refining |
Sales Range | $5 M to 10M |
# of Employees | 62 |
Plant Area |
516,000
ft2
|
Annual Production | 25,000,000
lb
|
Production Hrs. Annual | 4,416
hrs
|
Location (State) | Louisiana |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $394,173 | 6,201,600 |
kWh
|
$0.064 |
Electricity Demand | $3,414 | 14,784 |
kW-mo/yr
|
$0.23 |
Electricity Fees | $15,600 | - |
|
- |
Natural Gas | $1,133,742 | 251,023 |
MMBtu
|
$4.52 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $167,997 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $42,479 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.2441: Preheat boiler makeup water with waste process heat | $124,711 | $98,000 | - | - | - |
$124,711
-
MMBtu
|
- | |
02 | 2.2135: Repair and eliminate steam leaks | $37,488 | $4,840 | - | - | - |
$37,488
-
MMBtu
|
- | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,776 | $3,200 |
$2,672
42,036
kWh
|
- | $104 | - | - | |
04 | 2.7134: Use photocell controls | $715 | $45 |
$673
10,584
kWh
|
$15
-
kW-mo/yr
|
$27 | - | - | |
05 | 2.2511: Insulate bare equipment | $492 | $565 | - | - | - |
$492
-
MMBtu
|
- | |
06 | 2.7135: Install occupancy sensors | $315 | $90 |
$294
4,625
kWh
|
$9
-
kW-mo/yr
|
$12 | - | - | |
07 | 4.611: Begin a practice of predictive / preventative maintenance | $1,500 | $60 | - | - | - | - | $1,500 | |
TOTAL RECOMMENDED | $167,997 | $106,800 |
$3,639
57,245
kWh
|
$24
-
kW-mo/yr
|
$143 |
$162,691
-
MMBtu
|
$1,500 | ||
TOTAL IMPLEMENTED | $42,479 | $8,145 |
$3,345
52,620
kWh
|
$15
-
kW-mo/yr
|
$131 |
$37,488
-
MMBtu
|
$1,500 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Personnel Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs