ITAC Assessment: LL0183
ITAC logo
ITAC Assessment: LL0183
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product Ships
NAICS 336612: Boat Building
SIC 3732: Boat Building and Repairing
Sales Range $50
M
to 100
M
# of Employees 260
Plant Area 115,000
ft2
Annual Production 6
pieces
Production Hrs. Annual 4,680
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $150,902 2,912,528
kWh
Electricity Demand $75,377 11,266
kW-mo/yr
Electricity Fees $10,778 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $18,186 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,842

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
01 2.3212: Optimize plant power factor $9,156 $14,105 - $8,737
-
kW-mo/yr
$419
02 2.7134: Use photocell controls $2,598 $585 $1,482
28,604
kWh
$997
-
kW-mo/yr
$119
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,585 $1,760 $2,467
47,620
kWh
- $118
04 2.7111: Reduce illumination to minimum necessary levels $2,257 $600 $1,137
21,959
kWh
$1,017
-
kW-mo/yr
$103
05 2.8112: Combine utility meters $1,413 $60 - - $1,413
06 2.7142: Utilize higher efficiency lamps and/or ballasts $177 $50 $136
2,628
kWh
$33
-
kW-mo/yr
$8
TOTAL RECOMMENDED $18,186 $17,160 $5,222
100,811
kWh
$10,784
-
kW-mo/yr
$2,180
TOTAL IMPLEMENTED $4,842 $2,360 $3,604
69,579
kWh
$1,017
-
kW-mo/yr
$221
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs