Assessment Year | 2003 |
---|---|
Principal Product | Sports Equipment |
NAICS | 339920: Sporting and Athletic Goods Manufacturing |
SIC | 3949: Sporting and Athletic Goods, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 180 |
Plant Area |
45,000
ft2
|
Annual Production | 75,000
pieces
|
Production Hrs. Annual | 2,080
hrs
|
Location (State) | Louisiana |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $111,268 | 1,408,442 |
kWh
|
$0.079 |
Electricity Fees | $9,283 | - |
|
- |
Natural Gas | $56,804 | 6,359 |
MMBtu
|
$8.93 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $14,665 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $11,990 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Fees Savings | Natural Gas Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $5,804 | $4,160 |
$5,586
70,712
kWh
|
$218 | - | - | |
02 | 2.8123: Pay utility bills on time | $2,710 | $30 | - | $2,710 | - | - | |
03 | 2.7224: Reduce space conditioning during non-working hours | $2,193 | $316 |
$2,108
27,594
kWh
|
$85 | - | - | |
04 | 2.2511: Insulate bare equipment | $1,253 | $1,600 | - | $47 |
$1,206
-
MMBtu
|
- | |
05 | 2.7111: Reduce illumination to minimum necessary levels | $1,131 | $235 |
$1,089
13,781
kWh
|
$42 | - | - | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,096 | $665 |
$500
6,325
kWh
|
$19 | - | $577 | |
07 | 2.7135: Install occupancy sensors | $30 | $43 |
$29
363
kWh
|
$1 | - | - | |
08 | 4.611: Begin a practice of predictive / preventative maintenance | $448 | $40 | - | - | - | $448 | |
TOTAL RECOMMENDED | $14,665 | $7,089 |
$9,312
118,775
kWh
|
$3,122 |
$1,206
-
MMBtu
|
$1,025 | ||
TOTAL IMPLEMENTED | $11,990 | $6,149 |
$7,723
98,669
kWh
|
$3,061 |
$1,206
-
MMBtu
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Fees Savings | Natural Gas Savings | Personnel Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs