ITAC Assessment: LL0177
ITAC logo
ITAC Assessment: LL0177
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product Sports Equipment
NAICS 339920: Sporting and Athletic Goods Manufacturing
SIC 3949: Sporting and Athletic Goods, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 180
Plant Area 45,000
ft2
Annual Production 75,000
pieces
Production Hrs. Annual 2,080
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $111,268 1,408,442
kWh
Electricity Fees $9,283 -
Natural Gas $56,804 6,359
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $14,665 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $11,990

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Fees Savings Natural Gas Savings Personnel Changes Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $5,804 $4,160 $5,586
70,712
kWh
$218 - -
02 2.8123: Pay utility bills on time $2,710 $30 - $2,710 - -
03 2.7224: Reduce space conditioning during non-working hours $2,193 $316 $2,108
27,594
kWh
$85 - -
04 2.2511: Insulate bare equipment $1,253 $1,600 - $47 $1,206
-
MMBtu
-
05 2.7111: Reduce illumination to minimum necessary levels $1,131 $235 $1,089
13,781
kWh
$42 - -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $1,096 $665 $500
6,325
kWh
$19 - $577
07 2.7135: Install occupancy sensors $30 $43 $29
363
kWh
$1 - -
08 4.611: Begin a practice of predictive / preventative maintenance $448 $40 - - - $448
TOTAL RECOMMENDED $14,665 $7,089 $9,312
118,775
kWh
$3,122 $1,206
-
MMBtu
$1,025
TOTAL IMPLEMENTED $11,990 $6,149 $7,723
98,669
kWh
$3,061 $1,206
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Fees Savings Natural Gas Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs