ITAC Assessment: LL0176
ITAC logo
ITAC Assessment: LL0176
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product Oilfield service equipment
NAICS 333132: Oil and Gas Field Machinery and Equipment Manufacturing
SIC 3533: Oil and Gas Field Machinery and Equipment
Sales Range $10
M
to 50
M
# of Employees 72
Plant Area 25,000
ft2
Annual Production 28,000
pieces
Production Hrs. Annual 8,760
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $65,568 1,275,200
kWh
Electricity Demand $16,264 2,894
kW-mo/yr
Electricity Fees $3,997 -
Natural Gas $1,261 113
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $11,336 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $8,715

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Solid Waste (non-haz) Savings Personnel Changes Savings
01 2.7135: Install occupancy sensors $4,838 $903 $3,353
65,203
kWh
$1,259
-
kW-mo/yr
$226 - -
02 2.7111: Reduce illumination to minimum necessary levels $2,621 $192 $2,106
40,948
kWh
$393
-
kW-mo/yr
$122 - -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $2,009 $1,200 $377
7,323
kWh
- $18 - $1,614
04 2.7134: Use photocell controls $590 $112 $411
7,989
kWh
$152
-
kW-mo/yr
$27 - -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $278 $80 $265
5,150
kWh
- $13 - -
06 3.5313: Increase amount of waste recovered for resale $1,000 - - - - $1,000
-
lb
-
TOTAL RECOMMENDED $11,336 $2,487 $6,512
126,613
kWh
$1,804
-
kW-mo/yr
$406 $1,000
-
lb
$1,614
TOTAL IMPLEMENTED $8,715 $2,295 $4,406
85,665
kWh
$1,411
-
kW-mo/yr
$284 $1,000
-
lb
$1,614
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Solid Waste (non-haz) Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs