ITAC Assessment: LL0173
ITAC logo
ITAC Assessment: LL0173
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product Flow control valves
NAICS 324110: Petroleum Refineries
SIC 2911: Petroleum Refining
Sales Range $5
M
to 10
M
# of Employees 35
Plant Area 30,000
ft2
Annual Production 10,000
pieces
Production Hrs. Annual 2,500
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $33,220 675,400
kWh
Electricity Demand $14,972 2,664
kW-mo/yr
Electricity Fees $2,516 -
Natural Gas $79 11
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $16,640 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.7243: Improve air circulation with destratification fans / other methods $10,856 $4,436 $10,319
209,788
kWh
- $537 - -
02 2.4235: Remove or close off unneeded compressed air lines $1,828 $770 $1,738
35,332
kWh
- $90 - -
03 2.7111: Reduce illumination to minimum necessary levels $1,184 $345 $653
13,279
kWh
$472
-
kW-mo/yr
$59 - -
04 2.7224: Reduce space conditioning during non-working hours $599 $158 $569
11,574
kWh
- $30 - -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $583 $560 $554
11,258
kWh
- $29 - -
06 2.4231: Reduce the pressure of compressed air to the minimum required $474 $15 $277
5,639
kWh
$174
-
kW-mo/yr
$23 - -
07 2.7134: Use photocell controls $439 $598 $417
8,481
kWh
- $22 - -
08 2.7142: Utilize higher efficiency lamps and/or ballasts $571 $420 $197
3,995
kWh
- $10 $218 $146
09 2.7135: Install occupancy sensors $106 $130 $101
2,053
kWh
- $5 - -
TOTAL RECOMMENDED $16,640 $7,432 $14,825
301,399
kWh
$646
-
kW-mo/yr
$805 $218 $146
TOTAL IMPLEMENTED - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs