ITAC Assessment: LL0168
ITAC logo
ITAC Assessment: LL0168
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product Pump fabrication
NAICS 333911: Pump and Pumping Equipment Manufacturing
SIC 3561: Pumps and Pumping Equipment
Sales Range $50
M
to 100
M
# of Employees 200
Plant Area 253,952
ft2
Annual Production 150,000
pieces
Production Hrs. Annual 7,000
hrs
Location (State) Arkansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $143,949 5,297,292
kWh
Electricity Demand $93,762 10,797
kW-mo/yr
Electricity Fees $27,946 -
Natural Gas $65,959 12,058
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $33,571 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $10,479

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Personnel Changes Savings
01 2.7134: Use photocell controls $8,239 $1,196 - - $512 $7,727
-
MMBtu
-
02 2.7111: Reduce illumination to minimum necessary levels $6,916 $900 $3,760
138,232
kWh
$2,433
-
kW-mo/yr
$723 - -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $6,845 $4,800 $6,128
225,304
kWh
- $717 - -
04 2.7135: Install occupancy sensors $5,699 $280 $3,140
115,439
kWh
$1,962
-
kW-mo/yr
$597 - -
05 2.7134: Use photocell controls $1,257 $1,784 $1,125
41,342
kWh
- $132 - -
06 2.4231: Reduce the pressure of compressed air to the minimum required $981 $20 $574
21,099
kWh
$304
-
kW-mo/yr
$103 - -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $488 $240 $149
5,466
kWh
- $17 - $322
08 4.611: Begin a practice of predictive / preventative maintenance $3,146 $1,157 - - - - $3,146
TOTAL RECOMMENDED $33,571 $10,377 $14,876
546,882
kWh
$4,699
-
kW-mo/yr
$2,801 $7,727
-
MMBtu
$3,468
TOTAL IMPLEMENTED $10,479 $6,197 $6,277
230,770
kWh
- $734 - $3,468
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs