ITAC Assessment: LL0167
ITAC logo
ITAC Assessment: LL0167
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product Fluid valves
NAICS 333995: Fluid Power Cylinder and Actuator Manufacturing
SIC 3593: Fluid Power Cylinders and Actuators
Sales Range $1
M
to 5
M
# of Employees 25
Plant Area 30,000
ft2
Annual Production 20,000
pieces
Production Hrs. Annual 2,600
hrs
Location (State) Arkansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Natural Gas $1,583 206
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $7,211 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,091

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.3137: Use power during off-peak periods $3,779 - - $3,542
-
kW-mo/yr
$237 - - -
02 2.7135: Install occupancy sensors $1,025 $112 $654
9,631
kWh
$307
-
kW-mo/yr
$64 - - -
03 2.7111: Reduce illumination to minimum necessary levels $848 $90 $644
9,489
kWh
$151
-
kW-mo/yr
$53 - - -
04 2.7135: Install occupancy sensors $578 $196 $369
5,434
kWh
$173
-
kW-mo/yr
$36 - - -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $360 $140 $186
2,733
kWh
- $12 - $73 $89
06 2.7134: Use photocell controls $292 $191 - - $18 $274
-
MMBtu
- -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $130 $80 $122
1,798
kWh
- $8 - - -
08 2.7134: Use photocell controls $113 $40 $94
1,382
kWh
$12
-
kW-mo/yr
$7 - - -
09 2.7142: Utilize higher efficiency lamps and/or ballasts $86 $90 $81
1,199
kWh
- $5 - - -
TOTAL RECOMMENDED $7,211 $939 $2,150
31,666
kWh
$4,185
-
kW-mo/yr
$440 $274
-
MMBtu
$73 $89
TOTAL IMPLEMENTED $1,091 $210 $860
12,669
kWh
$163
-
kW-mo/yr
$68 - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs