ITAC Assessment: LL0166
ITAC logo
ITAC Assessment: LL0166
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product Natural Gas Purification
NAICS 324110: Petroleum Refineries
SIC 2911: Petroleum Refining
Sales Range $100
M
to 500
M
# of Employees 50
Plant Area 2,100,000
ft2
Annual Production 73,000
units
Production Hrs. Annual 2,860
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $532,474 16,830,000
kWh
Electricity Demand $266,833 30,483
kW-mo/yr
Electricity Fees $86,889 -
Natural Gas $110,260 31,503
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $193,496 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $172,842

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 2.1336: Install equipment to utilize waste fuel $100,695 $120,000 - - - $100,695
-
MMBtu
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $16,855 $9,440 $16,207
509,960
kWh
- $648 -
03 2.2511: Insulate bare equipment $9,566 $3,733 - - - $9,566
-
MMBtu
04 2.4231: Reduce the pressure of compressed air to the minimum required $7,286 $20 $4,757
149,671
kWh
$2,249
-
kW-mo/yr
$280 -
05 2.7134: Use photocell controls $1,918 $492 $1,266
39,836
kWh
$578
-
kW-mo/yr
$74 -
06 2.7111: Reduce illumination to minimum necessary levels $967 $570 $589
18,540
kWh
$341
-
kW-mo/yr
$37 -
07 2.7135: Install occupancy sensors $917 $572 $339
10,663
kWh
$543
-
kW-mo/yr
$35 -
08 2.8114: Change rate schedules or other changes in utility service $55,292 - - - $55,292 -
TOTAL RECOMMENDED $193,496 $134,827 $23,158
728,670
kWh
$3,711
-
kW-mo/yr
$56,366 $110,261
-
MMBtu
TOTAL IMPLEMENTED $172,842 $129,440 $16,207
509,960
kWh
- $55,940 $100,695
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs