Assessment Year | 2003 |
---|---|
Principal Product | Natural Gas Purification |
NAICS | 324110: Petroleum Refineries |
SIC | 2911: Petroleum Refining |
Sales Range | $100 M to 500M |
# of Employees | 50 |
Plant Area |
2,100,000
ft2
|
Annual Production | 73,000
units
|
Production Hrs. Annual | 2,860
hrs
|
Location (State) | Louisiana |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $532,474 | 16,830,000 |
kWh
|
$0.032 |
Electricity Demand | $266,833 | 30,483 |
kW-mo/yr
|
$8.75 |
Electricity Fees | $86,889 | - |
|
- |
Natural Gas | $110,260 | 31,503 |
MMBtu
|
$3.50 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $193,496 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $172,842 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.1336: Install equipment to utilize waste fuel | $100,695 | $120,000 | - | - | - |
$100,695
-
MMBtu
|
|
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $16,855 | $9,440 |
$16,207
509,960
kWh
|
- | $648 | - | |
03 | 2.2511: Insulate bare equipment | $9,566 | $3,733 | - | - | - |
$9,566
-
MMBtu
|
|
04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $7,286 | $20 |
$4,757
149,671
kWh
|
$2,249
-
kW-mo/yr
|
$280 | - | |
05 | 2.7134: Use photocell controls | $1,918 | $492 |
$1,266
39,836
kWh
|
$578
-
kW-mo/yr
|
$74 | - | |
06 | 2.7111: Reduce illumination to minimum necessary levels | $967 | $570 |
$589
18,540
kWh
|
$341
-
kW-mo/yr
|
$37 | - | |
07 | 2.7135: Install occupancy sensors | $917 | $572 |
$339
10,663
kWh
|
$543
-
kW-mo/yr
|
$35 | - | |
08 | 2.8114: Change rate schedules or other changes in utility service | $55,292 | - | - | - | $55,292 | - | |
TOTAL RECOMMENDED | $193,496 | $134,827 |
$23,158
728,670
kWh
|
$3,711
-
kW-mo/yr
|
$56,366 |
$110,261
-
MMBtu
|
||
TOTAL IMPLEMENTED | $172,842 | $129,440 |
$16,207
509,960
kWh
|
- | $55,940 |
$100,695
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs