Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product HFCs
NAICS 325998: All Other Miscellaneous Chemical Product and Preparation Manufacturing
SIC 2819: Industrial Inorganic Chemicals, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 120
Plant Area 208,000
ft2
Annual Production 39,000
ton
Production Hrs. Annual 8,760
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $3,780,874 121,581,962
kWh
Electricity Demand $2,301,415 208,089
kW-mo/yr
Electricity Fees $313,319 -
Natural Gas $7,233,842 1,515,791
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $588,896 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $246,886

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Personnel Changes Savings
01 2.3321: Use steam pressure reduction to generate power $336,249 $481,633 $671,319
11,151,480
kWh
- - $(-335,070.0)
-
MMBtu
-
02 2.1233: Analyze flue gas for proper air/fuel ratio $217,796 $12,400 - - - $217,796
-
MMBtu
-
03 2.7134: Use photocell controls $19,066 $924 $8,609
276,827
kWh
$9,523
-
kW-mo/yr
$934 - -
04 2.4231: Reduce the pressure of compressed air to the minimum required $5,635 $20 $3,368
108,296
kWh
$1,991
-
kW-mo/yr
$276 - -
05 2.7135: Install occupancy sensors $4,821 $1,204 $1,897
60,985
kWh
$2,688
-
kW-mo/yr
$236 - -
06 2.2511: Insulate bare equipment $4,389 $642 - - - $4,389
-
MMBtu
-
07 2.7142: Utilize higher efficiency lamps and/or ballasts $940 $525 $319
10,249
kWh
- $16 - $605
TOTAL RECOMMENDED $588,896 $497,348 $685,512
11,607,837
kWh
$14,202
-
kW-mo/yr
$1,462 $(-112,885.0)
-
MMBtu
$605
TOTAL IMPLEMENTED $246,886 $13,986 $11,977
385,123
kWh
$11,514
-
kW-mo/yr
$1,210 $222,185
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs