ITAC Assessment: LL0156
ITAC logo
ITAC Assessment: LL0156
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product Nitro-paraffin and derivatives
NAICS 325180: Other Basic Inorganic Chemical Manufacturing
SIC 2890:
Sales Range $100
M
to 500
M
# of Employees 179
Plant Area 2,178,000
ft2
Annual Production 85,000,000
lb
Production Hrs. Annual 8,736
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $2,748,024 53,390,100
kWh
Electricity Demand $179,431 13,129
kW-mo/yr
Electricity Fees $122,039 -
Natural Gas $4,466,254 1,664,676
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $3,238,239 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,272,728

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Fees Savings Natural Gas Savings
01 2.2121: Increase amount of condensate returned $944,111 $379,982 - - $944,111
-
MMBtu
02 2.3412: Use waste heat to produce steam to drive a steam turbine-generator $918,298 $3,111,056 $3,201,771
47,358,990
kWh
- $(-2,283,473.0)
-
MMBtu
03 2.2135: Repair and eliminate steam leaks $847,706 $1,220 - - $847,706
-
MMBtu
04 2.1212: Operate boilers on high fire setting $103,102 - - - $103,102
-
MMBtu
05 2.2511: Insulate bare equipment $49,634 $3,890 - - $49,634
-
MMBtu
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $32,003 $5,479 $30,772
514,933
kWh
$1,231 -
07 2.2113: Repair or replace steam traps $343,385 $3,840 - - $343,385
-
MMBtu
TOTAL RECOMMENDED $3,238,239 $3,505,467 $3,232,543
47,873,923
kWh
$1,231 $4,465
-
MMBtu
TOTAL IMPLEMENTED $1,272,728 $14,429 $30,772
514,933
kWh
$1,231 $1,240,725
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Fees Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs