Assessment Year | 2003 |
---|---|
Principal Product | Nitro-paraffin and derivatives |
NAICS | 325180: Other Basic Inorganic Chemical Manufacturing |
SIC | 2890: |
Sales Range | $100 M to 500M |
# of Employees | 179 |
Plant Area |
2,178,000
ft2
|
Annual Production | 85,000,000
lb
|
Production Hrs. Annual | 8,736
hrs
|
Location (State) | Louisiana |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $2,748,024 | 53,390,100 |
kWh
|
$0.051 |
Electricity Demand | $179,431 | 13,129 |
kW-mo/yr
|
$13.67 |
Electricity Fees | $122,039 | - |
|
- |
Natural Gas | $4,466,254 | 1,664,676 |
MMBtu
|
$2.68 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $3,238,239 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $1,272,728 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Fees Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.2121: Increase amount of condensate returned | $944,111 | $379,982 | - | - |
$944,111
-
MMBtu
|
|
02 | 2.3412: Use waste heat to produce steam to drive a steam turbine-generator | $918,298 | $3,111,056 |
$3,201,771
47,358,990
kWh
|
- |
$(-2,283,473.0)
-
MMBtu
|
|
03 | 2.2135: Repair and eliminate steam leaks | $847,706 | $1,220 | - | - |
$847,706
-
MMBtu
|
|
04 | 2.1212: Operate boilers on high fire setting | $103,102 | - | - | - |
$103,102
-
MMBtu
|
|
05 | 2.2511: Insulate bare equipment | $49,634 | $3,890 | - | - |
$49,634
-
MMBtu
|
|
06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $32,003 | $5,479 |
$30,772
514,933
kWh
|
$1,231 | - | |
07 | 2.2113: Repair or replace steam traps | $343,385 | $3,840 | - | - |
$343,385
-
MMBtu
|
|
TOTAL RECOMMENDED | $3,238,239 | $3,505,467 |
$3,232,543
47,873,923
kWh
|
$1,231 |
$4,465
-
MMBtu
|
||
TOTAL IMPLEMENTED | $1,272,728 | $14,429 |
$30,772
514,933
kWh
|
$1,231 |
$1,240,725
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Fees Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs