Assessment Year | 2003 |
---|---|
Principal Product | Rope |
NAICS | 314994: Rope, Cordage, Twine, Tire Cord, and Tire Fabric Mills |
SIC | 2298: Cordage and Twine |
Sales Range | $5 M to 10M |
# of Employees | 97 |
Plant Area |
78,000
ft2
|
Annual Production | 5,000,000
lb
|
Production Hrs. Annual | 6,000
hrs
|
Location (State) | Louisiana |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $246,974 | 4,382,400 |
kWh
|
$0.056 |
Electricity Fees | $9,861 | - |
|
- |
Natural Gas | $6,548 | 814 |
MMBtu
|
$8.04 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $49,326 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $30,035 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Fees Savings | Natural Gas Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.1224: Replace boiler | $17,740 | $33,000 |
$34,492
612,000
kWh
|
$670 |
$(-17,422.0)
-
MMBtu
|
- | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,929 | $975 |
$1,855
32,906
kWh
|
$74 | - | - | |
03 | 2.2511: Insulate bare equipment | $1,265 | $262 |
$1,216
21,577
kWh
|
$49 | - | - | |
04 | 2.7111: Reduce illumination to minimum necessary levels | $839 | $75 |
$802
14,227
kWh
|
$37 | - | - | |
05 | 2.2437: Recover waste heat from equipment | $712 | $756 | - | - |
$712
-
MMBtu
|
- | |
06 | 2.7135: Install occupancy sensors | $518 | $364 |
$498
8,842
kWh
|
$20 | - | - | |
07 | 4.611: Begin a practice of predictive / preventative maintenance | $25,317 | $13,100 | - | - | - | $25,317 | |
08 | 4.611: Begin a practice of predictive / preventative maintenance | $1,006 | $186 | - | - | - | $1,006 | |
TOTAL RECOMMENDED | $49,326 | $48,718 |
$38,863
689,552
kWh
|
$850 |
$(-16,710.0)
-
MMBtu
|
$26,323 | ||
TOTAL IMPLEMENTED | $30,035 | $14,887 |
$3,569
63,325
kWh
|
$143 | - | $26,323 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Fees Savings | Natural Gas Savings | Personnel Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs