ITAC Assessment: WI0010
ITAC logo
ITAC Assessment: WI0010
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1987
Principal Product SHIPPING CONTAINERS
NAICS
n/a
SIC 2653: Corrugated and Solid Fiber Boxes
Sales Range $10
M
to 50
M
# of Employees 150
Plant Area
n/a
Annual Production 40,000
thousand feet
Production Hrs. Annual 6,000
hrs
Location (State) Wisconsin

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $267,588 5,478,019
kWh
Natural Gas $298,890 65,415
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $26,041 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $14,740

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.4312: Improve lubrication practices $2,205 - $2,205
45,135
kWh
- -
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,378 - $1,378
28,136
kWh
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $4,998 $1,385 $4,998
102,286
kWh
- -
04 2.1233: Analyze flue gas for proper air/fuel ratio $8,364 $500 - $8,614
-
MMBtu
$(-250.0)
05 2.2414: Use waste heat from hot flue gases to preheat $9,096 $32,000 - $9,096
-
MMBtu
-
TOTAL RECOMMENDED $26,041 $33,885 $8,581
175,557
kWh
$17,710
-
MMBtu
$(-250.0)
TOTAL IMPLEMENTED $14,740 $1,885 $6,376
130,422
kWh
$8,614
-
MMBtu
$(-250.0)
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs