ITAC Assessment: LL0154
ITAC logo
ITAC Assessment: LL0154
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product Chemicals
NAICS 325110: Petrochemical Manufacturing
SIC 2869: Industrial Organic Chemicals, Not Elsewhere Classified
Sales Range greater than $500
M
# of Employees 1,400
Plant Area 72,000,000
ft2
Annual Production 7,200,000,000
lb
Production Hrs. Annual 8,760
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $29,219,392 1,219,985,200
kWh
Electricity Demand $13,356,917 1,814,684
kW-mo/yr
Electricity Fees $44,504 -
Natural Gas $52,697,885 18,519,383
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $36,804,695 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $109,742

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Other Liquid (non-haz) Savings
01 2.2135: Repair and eliminate steam leaks $18,488,939 $413,700 n/a - - - $18,488,939
-
MMBtu
-
02 2.2121: Increase amount of condensate returned $11,340,034 $773,535 n/a - - - $9,187,645
-
MMBtu
$2,152,389
-
gal
03 2.1336: Install equipment to utilize waste fuel $6,313,507 $750,000 - - - $6,313,507
-
MMBtu
-
04 2.2162: Reduce excess steam bleeding $504,716 $45,360 - - - $504,716
-
MMBtu
-
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $109,742 $60,716 $105,521
4,405,868
kWh
- $4,221 - -
06 2.7134: Use photocell controls $36,675 $4,100 $24,504
1,023,120
kWh
$10,760
-
kW-mo/yr
$1,411 - -
07 2.2511: Insulate bare equipment $11,082 $2,865 - - - $11,082
-
MMBtu
-
TOTAL RECOMMENDED $36,804,695 $2,050,276 $130,025
5,428,988
kWh
$10,760
-
kW-mo/yr
$5,632 $34,505,889
-
MMBtu
$2,152,389
-
gal
TOTAL IMPLEMENTED $109,742 $60,716 $105,521
4,405,868
kWh
- $4,221 - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Other Liquid (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs