ITAC Assessment: SF0020
ITAC logo
ITAC Assessment: SF0020
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Candy
NAICS
n/a
SIC 2064: Candy and Other Confectionery Products
Sales Range $10
M
to 50
M
# of Employees 250
Plant Area 160,000
ft2
Annual Production 35,000,000
lb
Production Hrs. Annual 4,358
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $374,011 3,458,675
kWh
Natural Gas $401,351 103,532
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $339,012 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $30,357

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.4133: Use most efficient type of electric motors $16,431 $11,437 $16,431
152,110
kWh
- -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $6,920 $9,089 $6,920
64,185
kWh
- -
03 2.7135: Install occupancy sensors $3,335 $1,851 $3,335
30,774
kWh
- -
04 2.1233: Analyze flue gas for proper air/fuel ratio $7,006 - - $7,006
-
MMBtu
-
05 2.3417: Use waste heat with a closed-cycle gas turbine-generator set to cogenerate electricity and heat $305,320 $1,140,000 - - $305,320
TOTAL RECOMMENDED $339,012 $1,162,377 $26,686
247,069
kWh
$7,006
-
MMBtu
$305,320
TOTAL IMPLEMENTED $30,357 $20,526 $23,351
216,295
kWh
$7,006
-
MMBtu
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs