ITAC Assessment: LL0151
ITAC logo
ITAC Assessment: LL0151
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product Oilfiled Tools
NAICS
n/a
SIC 3533: Oil and Gas Field Machinery and Equipment
Sales Range $50
M
to 100
M
# of Employees 240
Plant Area 180,000
ft2
Annual Production 6,000
pieces
Production Hrs. Annual 8,736
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $164,912 4,499,348
kWh
Electricity Demand $71,618 9,744
kW-mo/yr
Electricity Fees $935 -
Natural Gas $169,532 31,300
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $101,502 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $70,544

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Other Liquid (haz) Savings Administrative Changes Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $15,605 $4,350 $15,005
412,688
kWh
- $600 - - -
02 2.7243: Improve air circulation with destratification fans / other methods $15,140 $4,600 - - - $15,140
-
MMBtu
- -
03 2.7134: Use photocell controls $10,108 $1,092 $5,456
150,050
kWh
$4,263
-
kW-mo/yr
$389 - - -
04 2.7135: Install occupancy sensors $5,710 $494 $4,299
118,223
kWh
$1,191
-
kW-mo/yr
$220 - - -
05 2.1134: Eliminate leaks in combustible gas lines $3,410 $1,240 - - - $3,410
-
MMBtu
- -
06 2.7111: Reduce illumination to minimum necessary levels $1,284 $180 $869
23,902
kWh
$366
-
kW-mo/yr
$49 - - -
07 3.5111: Filter and reuse hydraulic oil $40,689 $8,000 - - - - $40,689
-
gal
-
08 4.611: Begin a practice of predictive / preventative maintenance $9,556 $12,425 - - - - - $9,556
TOTAL RECOMMENDED $101,502 $32,381 $25,629
704,863
kWh
$5,820
-
kW-mo/yr
$1,258 $18,550
-
MMBtu
$40,689
-
gal
$9,556
TOTAL IMPLEMENTED $70,544 $26,195 $15,874
436,590
kWh
$366
-
kW-mo/yr
$649 $3,410
-
MMBtu
$40,689
-
gal
$9,556
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Other Liquid (haz) Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs