ITAC Assessment: LL0147
ITAC logo
ITAC Assessment: LL0147
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product Film and packaging printing
NAICS
n/a
SIC 2671: Packaging Paper and Plastics Film, Coated and Laminated
Sales Range $10
M
to 50
M
# of Employees 180
Plant Area 206,040
ft2
Annual Production 13,200,000
lb
Production Hrs. Annual 6,240
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $419,749 13,698,000
kWh
Electricity Demand $116,631 21,206
kW-mo/yr
Electricity Fees $54,568 -
Natural Gas $10,949 1,291
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $20,852 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $8,242

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Solid Waste (non-haz) Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $5,887 $1,500 $5,661
185,055
kWh
- $226 -
02 2.7111: Reduce illumination to minimum necessary levels $3,034 - $2,315
75,689
kWh
$602
-
kW-mo/yr
$117 -
03 2.7134: Use photocell controls $2,355 $421 $1,422
46,476
kWh
$842
-
kW-mo/yr
$91 -
04 2.7135: Install occupancy sensors $450 $104 $240
7,840
kWh
$193
-
kW-mo/yr
$17 -
05 3.5316: Contract a wood pallet recycling company $9,126 - - - - $9,126
-
lb
TOTAL RECOMMENDED $20,852 $2,025 $9,638
315,060
kWh
$1,637
-
kW-mo/yr
$451 $9,126
-
lb
TOTAL IMPLEMENTED $8,242 $1,921 $7,083
231,531
kWh
$842
-
kW-mo/yr
$317 -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs