| Assessment Year | 2002 |
|---|---|
| Principal Product | Asphalt |
| NAICS |
n/a
|
| SIC | 2951: Asphalt Paving Mixtures and Blocks |
| Sales Range | $1 M to 5M |
| # of Employees | 6 |
| Plant Area |
336,000
ft2
|
| Annual Production | 131,255
ton
|
| Production Hrs. Annual | 2,600
hrs
|
| Location (State) | Louisiana |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $19,945 | 428,549 |
kWh
|
$0.047 |
| Electricity Demand | $18,715 | 3,330 |
kW-mo/yr
|
$5.62 |
| Electricity Fees | $15,555 | - |
|
- |
| Natural Gas | $237,963 | 44,086 |
MMBtu
|
$5.40 |
| Fuel Oil #2 | $15,000 | 1,542 |
MMBtu
|
$9.73 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $20,899 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $11,112 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Fuel Oil #2 Savings |
|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $10,063 | $2,340 |
$9,676
207,910
kWh
|
- | $387 | - | - | |
| 02 | 2.2511: Insulate bare equipment | $8,581 | $4,711 | - | - | - |
$8,581
-
MMBtu
|
- | |
| 03 | 2.2511: Insulate bare equipment | $1,206 | $361 | - | - | - | - |
$1,206
-
MMBtu
|
|
| 04 | 2.2511: Insulate bare equipment | $807 | $322 | - | - | - | - |
$807
-
MMBtu
|
|
| 05 | 2.7134: Use photocell controls | $242 | $104 |
$171
3,677
kWh
|
$62
-
kW-mo/yr
|
$9 | - | - | |
| TOTAL RECOMMENDED | $20,899 | $7,838 |
$9,847
211,587
kWh
|
$62
-
kW-mo/yr
|
$396 |
$8,581
-
MMBtu
|
$2,013
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $11,112 | $2,766 |
$9,847
211,587
kWh
|
$62
-
kW-mo/yr
|
$396 | - |
$807
-
MMBtu
|
||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs