ITAC Assessment: LL0144
ITAC logo
ITAC Assessment: LL0144
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product Asphalt
NAICS
n/a
SIC 2951: Asphalt Paving Mixtures and Blocks
Sales Range $1
M
to 5
M
# of Employees 6
Plant Area 336,000
ft2
Annual Production 131,255
ton
Production Hrs. Annual 2,600
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $19,945 428,549
kWh
Electricity Demand $18,715 3,330
kW-mo/yr
Electricity Fees $15,555 -
Natural Gas $237,963 44,086
MMBtu
Fuel Oil #2 $15,000 1,542
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $20,899 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $11,112

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Fuel Oil #2 Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $10,063 $2,340 $9,676
207,910
kWh
- $387 - -
02 2.2511: Insulate bare equipment $8,581 $4,711 - - - $8,581
-
MMBtu
-
03 2.2511: Insulate bare equipment $1,206 $361 - - - - $1,206
-
MMBtu
04 2.2511: Insulate bare equipment $807 $322 - - - - $807
-
MMBtu
05 2.7134: Use photocell controls $242 $104 $171
3,677
kWh
$62
-
kW-mo/yr
$9 - -
TOTAL RECOMMENDED $20,899 $7,838 $9,847
211,587
kWh
$62
-
kW-mo/yr
$396 $8,581
-
MMBtu
$2,013
-
MMBtu
TOTAL IMPLEMENTED $11,112 $2,766 $9,847
211,587
kWh
$62
-
kW-mo/yr
$396 - $807
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs