ITAC Assessment: LL0138
ITAC logo
ITAC Assessment: LL0138
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product Hydrofluoric acid
NAICS
n/a
SIC 2819: Industrial Inorganic Chemicals, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 56
Plant Area 625,000
ft2
Annual Production 117,000
ton
Production Hrs. Annual 8,736
hrs
Location (State) Iowa

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $3,814,130 91,876,602
kWh
Electricity Demand $1,618,663 145,731
kW-mo/yr
Electricity Fees $454,563 -
Natural Gas $5,766,504 1,250,702
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $229,832 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $227,197

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 2.3212: Optimize plant power factor $115,474 $103,740 - $111,033
-
kW-mo/yr
$4,441 -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $79,740 $6,360 $76,673
1,847,092
kWh
- $3,067 -
03 2.2511: Insulate bare equipment $10,164 $6,559 - - - $10,164
-
MMBtu
04 2.2511: Insulate bare equipment $9,316 $6,559 - - - $9,316
-
MMBtu
05 2.2511: Insulate bare equipment $6,985 $3,684 - - - $6,985
-
MMBtu
06 2.2511: Insulate bare equipment $4,080 $3,684 - - - $4,080
-
MMBtu
07 2.2511: Insulate bare equipment $1,438 $583 - - - $1,438
-
MMBtu
08 2.7134: Use photocell controls $1,196 $281 $650
15,650
kWh
$500
-
kW-mo/yr
$46 -
09 2.7134: Use photocell controls $532 $153 $290
6,980
kWh
$222
-
kW-mo/yr
$20 -
10 2.7134: Use photocell controls $475 $102 $257
6,198
kWh
$200
-
kW-mo/yr
$18 -
11 2.7134: Use photocell controls $164 $51 $91
2,196
kWh
$67
-
kW-mo/yr
$6 -
12 2.7134: Use photocell controls $164 $51 $91
2,196
kWh
$67
-
kW-mo/yr
$6 -
13 2.7134: Use photocell controls $104 $77 $56
1,360
kWh
$44
-
kW-mo/yr
$4 -
TOTAL RECOMMENDED $229,832 $131,884 $78,108
1,881,672
kWh
$112,133
-
kW-mo/yr
$7,608 $31,983
-
MMBtu
TOTAL IMPLEMENTED $227,197 $131,169 $76,673
1,847,092
kWh
$111,033
-
kW-mo/yr
$7,508 $31,983
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs