ITAC Assessment: LL0137
ITAC logo
ITAC Assessment: LL0137
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product Asphalt and Concrete
NAICS
n/a
SIC 2951: Asphalt Paving Mixtures and Blocks
Sales Range $5
M
to 10
M
# of Employees 13
Plant Area 508,000
ft2
Annual Production 250,000
ton
Production Hrs. Annual 4,368
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $71,729 1,049,714
kWh
Electricity Demand $31,554 5,643
kW-mo/yr
Electricity Fees $3,511 -
Natural Gas $336,131 59,582
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $57,896 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,456

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 2.2511: Insulate bare equipment $50,444 $27,801 - - - $50,444
-
MMBtu
02 2.2511: Insulate bare equipment $2,446 $1,992 - - - $2,446
-
MMBtu
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,946 $90 $1,871
26,752
kWh
- $75 -
04 2.7134: Use photocell controls $1,550 $104 $1,244
18,211
kWh
$246
-
kW-mo/yr
$60 -
05 2.7134: Use photocell controls $1,123 $182 $901
13,179
kWh
$179
-
kW-mo/yr
$43 -
06 2.7134: Use photocell controls $387 $26 $311
4,553
kWh
$61
-
kW-mo/yr
$15 -
TOTAL RECOMMENDED $57,896 $30,195 $4,327
62,695
kWh
$486
-
kW-mo/yr
$193 $52,890
-
MMBtu
TOTAL IMPLEMENTED $3,456 $298 $3,083
44,484
kWh
$240
-
kW-mo/yr
$133 -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs