Assessment Year | 2002 |
---|---|
Principal Product | Asphalt and Concrete |
NAICS |
n/a
|
SIC | 2951: Asphalt Paving Mixtures and Blocks |
Sales Range | $5 M to 10M |
# of Employees | 13 |
Plant Area |
508,000
ft2
|
Annual Production | 250,000
ton
|
Production Hrs. Annual | 4,368
hrs
|
Location (State) | Louisiana |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $71,729 | 1,049,714 |
kWh
|
$0.068 |
Electricity Demand | $31,554 | 5,643 |
kW-mo/yr
|
$5.59 |
Electricity Fees | $3,511 | - |
|
- |
Natural Gas | $336,131 | 59,582 |
MMBtu
|
$5.64 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $57,896 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $3,456 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.2511: Insulate bare equipment | $50,444 | $27,801 | - | - | - |
$50,444
-
MMBtu
|
|
02 | 2.2511: Insulate bare equipment | $2,446 | $1,992 | - | - | - |
$2,446
-
MMBtu
|
|
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,946 | $90 |
$1,871
26,752
kWh
|
- | $75 | - | |
04 | 2.7134: Use photocell controls | $1,550 | $104 |
$1,244
18,211
kWh
|
$246
-
kW-mo/yr
|
$60 | - | |
05 | 2.7134: Use photocell controls | $1,123 | $182 |
$901
13,179
kWh
|
$179
-
kW-mo/yr
|
$43 | - | |
06 | 2.7134: Use photocell controls | $387 | $26 |
$311
4,553
kWh
|
$61
-
kW-mo/yr
|
$15 | - | |
TOTAL RECOMMENDED | $57,896 | $30,195 |
$4,327
62,695
kWh
|
$486
-
kW-mo/yr
|
$193 |
$52,890
-
MMBtu
|
||
TOTAL IMPLEMENTED | $3,456 | $298 |
$3,083
44,484
kWh
|
$240
-
kW-mo/yr
|
$133 | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs