ITAC Assessment: LL0132
ITAC logo
ITAC Assessment: LL0132
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product Stairs
NAICS
n/a
SIC 3535: Conveyors and Conveying Equipment
Sales Range $1
M
to 5
M
# of Employees 25
Plant Area 41,800
ft2
Annual Production 4,500
pieces
Production Hrs. Annual 2,080
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $23,602 337,169
kWh
Natural Gas $22,837 2,140
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $5,529 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $601

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.2511: Insulate bare equipment $2,920 $947 - $2,920
-
MMBtu
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $981 $630 $981
13,472
kWh
-
03 2.7135: Install occupancy sensors $751 $780 $751
10,317
kWh
-
04 2.7121: Utilize daylight whenever possible in lieu of artificial light $601 $418 $601
8,253
kWh
-
05 2.7111: Reduce illumination to minimum necessary levels $276 - $276
3,794
kWh
-
TOTAL RECOMMENDED $5,529 $2,775 $2,609
35,836
kWh
$2,920
-
MMBtu
TOTAL IMPLEMENTED $601 $418 $601
8,253
kWh
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs