Assessment Year | 2002 |
---|---|
Principal Product | Building systems |
NAICS |
n/a
|
SIC | 3448: Prefabricated Metal Buildings and Components |
Sales Range | $10 M to 50M |
# of Employees | 211 |
Plant Area |
200,000
ft2
|
Annual Production | 46,000,000
lb
|
Production Hrs. Annual | 4,160
hrs
|
Location (State) | Louisiana |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $191,395 | 3,076,000 |
kWh
|
$0.062 |
Electricity Fees | $8,456 | - |
|
- |
Natural Gas | $1,170 | 55 |
MMBtu
|
$21.27 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $72,023 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $64,627 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Fees Savings | Water Disposal Savings |
---|---|---|---|---|---|---|---|
01 | 2.7111: Reduce illumination to minimum necessary levels | $8,705 | - |
$8,370
134,784
kWh
|
$335 | - | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $6,729 | $2,340 |
$6,470
104,198
kWh
|
$259 | - | |
03 | 2.7145: Install skylights | $6,716 | $734 |
$6,458
104,000
kWh
|
$258 | - | |
04 | 2.7111: Reduce illumination to minimum necessary levels | $1,838 | - |
$1,767
28,454
kWh
|
$71 | - | |
05 | 2.7226: Use computer programs to optimize hvac performance | $1,728 | $621 |
$1,662
26,761
kWh
|
$66 | - | |
06 | 2.7134: Use photocell controls | $680 | $230 |
$654
10,904
kWh
|
$26 | - | |
07 | 2.7111: Reduce illumination to minimum necessary levels | $600 | - |
$577
9,266
kWh
|
$23 | - | |
08 | 3.5316: Contract a wood pallet recycling company | $45,027 | - | - | - |
$45,027
-
Tgal
|
|
TOTAL RECOMMENDED | $72,023 | $3,925 |
$25,958
418,367
kWh
|
$1,038 |
$45,027
-
Tgal
|
||
TOTAL IMPLEMENTED | $64,627 | $2,961 |
$18,846
303,463
kWh
|
$754 |
$45,027
-
Tgal
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Fees Savings | Water Disposal Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs