| Assessment Year | 2001 |
|---|---|
| Principal Product | Soft drinks/bottling |
| NAICS |
n/a
|
| SIC | 2086: Bottled and Canned Soft Drinks and Carbonated Waters |
| Sales Range | $10 M to 50M |
| # of Employees | 26 |
| Plant Area |
63,000
ft2
|
| Annual Production | 18,000,000
pieces
|
| Production Hrs. Annual | 2,080
hrs
|
| Location (State) | Louisiana |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $150,141 | 1,938,306 |
kWh
|
$0.077 |
| Electricity Demand | $31,243 | 6,249 |
kW-mo/yr
|
$5.00 |
| Electricity Fees | $7,740 | - |
|
- |
| Natural Gas | $42,711 | 6,032 |
MMBtu
|
$7.08 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $10,084 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $9,237 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,416 | $1,740 |
$1,362
26,579
kWh
|
- | $54 | - | |
| 02 | 2.2511: Insulate bare equipment | $2,174 | $1,308 | - | - | - |
$2,174
-
MMBtu
|
|
| 03 | 2.2136: Install / repair insulation on steam lines | $1,389 | $2,686 | - | - | - |
$1,389
-
MMBtu
|
|
| 04 | 2.7135: Install occupancy sensors | $728 | $111 |
$450
7,807
kWh
|
$250
-
kW-mo/yr
|
$28 | - | |
| 05 | 2.7135: Install occupancy sensors | $119 | $16 |
$84
1,464
kWh
|
$30
-
kW-mo/yr
|
$5 | - | |
| 06 | 2.7134: Use photocell controls | $3,349 | $333 |
$2,070
35,936
kWh
|
$1,150
-
kW-mo/yr
|
$129 | - | |
| 07 | 2.7122: Disconnect ballasts | $909 | - |
$674
11,700
kWh
|
$200
-
kW-mo/yr
|
$35 | - | |
| TOTAL RECOMMENDED | $10,084 | $6,194 |
$4,640
83,486
kWh
|
$1,630
-
kW-mo/yr
|
$251 |
$3,563
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $9,237 | $6,067 |
$4,106
74,215
kWh
|
$1,350
-
kW-mo/yr
|
$218 |
$3,563
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs