ITAC Assessment: LL0123
ITAC logo
ITAC Assessment: LL0123
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product Soft drinks/bottling
NAICS
n/a
SIC 2086: Bottled and Canned Soft Drinks and Carbonated Waters
Sales Range $10
M
to 50
M
# of Employees 26
Plant Area 63,000
ft2
Annual Production 18,000,000
pieces
Production Hrs. Annual 2,080
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $150,141 1,938,306
kWh
Electricity Demand $31,243 6,249
kW-mo/yr
Electricity Fees $7,740 -
Natural Gas $42,711 6,032
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $10,084 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $9,237

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,416 $1,740 $1,362
26,579
kWh
- $54 -
02 2.2511: Insulate bare equipment $2,174 $1,308 - - - $2,174
-
MMBtu
03 2.2136: Install / repair insulation on steam lines $1,389 $2,686 - - - $1,389
-
MMBtu
04 2.7135: Install occupancy sensors $728 $111 $450
7,807
kWh
$250
-
kW-mo/yr
$28 -
05 2.7135: Install occupancy sensors $119 $16 $84
1,464
kWh
$30
-
kW-mo/yr
$5 -
06 2.7134: Use photocell controls $3,349 $333 $2,070
35,936
kWh
$1,150
-
kW-mo/yr
$129 -
07 2.7122: Disconnect ballasts $909 - $674
11,700
kWh
$200
-
kW-mo/yr
$35 -
TOTAL RECOMMENDED $10,084 $6,194 $4,640
83,486
kWh
$1,630
-
kW-mo/yr
$251 $3,563
-
MMBtu
TOTAL IMPLEMENTED $9,237 $6,067 $4,106
74,215
kWh
$1,350
-
kW-mo/yr
$218 $3,563
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs