ITAC Assessment: LL0116
ITAC logo
ITAC Assessment: LL0116
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product General Machining and Contract Manufacturing
NAICS
n/a
SIC 3312: Steel Works, Blast Furnaces (Including Coke Ovens), and Rolling Mills
Sales Range $10
M
to 50
M
# of Employees 135
Plant Area 80,000
ft2
Annual Production 60,000
pieces
Production Hrs. Annual 5,616
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $242,094 4,279,000
kWh
Electricity Demand $109,315 19,451
kW-mo/yr
Electricity Fees $14,056 -
Natural Gas $132 12
MMBtu
Other Gas $4,795 595
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $49,707 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $23,422

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings LPG Savings Other Gas Savings Primary Product Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,494 $1,440 $4,321
76,363
kWh
- $173 - - -
02 2.1335: Replace gasoline with diesel, lpg, or natural gas $2,754 $1,480 - - $105 $(-2,146.0)
-
MMBtu
$4,795
-
MMBtu
-
03 2.8114: Change rate schedules or other changes in utility service $6,478 $1,000 - - - - - $6,478
04 2.2511: Insulate bare equipment $16,464 $3,385 $15,831
279,800
kWh
- $633 - - -
05 2.7111: Reduce illumination to minimum necessary levels $2,464 - $1,874
33,116
kWh
$495
-
kW-mo/yr
$95 - - -
06 2.3212: Optimize plant power factor $17,053 $23,870 - $16,397
-
kW-mo/yr
$656 - - -
TOTAL RECOMMENDED $49,707 $31,175 $22,026
389,279
kWh
$16,892
-
kW-mo/yr
$1,662 $(-2,146.0)
-
MMBtu
$4,795
-
MMBtu
$6,478
TOTAL IMPLEMENTED $23,422 $4,825 $22,026
389,279
kWh
$495
-
kW-mo/yr
$901 - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings LPG Savings Other Gas Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs