ITAC Assessment: LL0111
ITAC logo
ITAC Assessment: LL0111
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product Steel Fabrication
NAICS
n/a
SIC 3433: Heating Equipment, Except Electric and Warm Air Furnaces
Sales Range $100
M
to 500
M
# of Employees 100
Plant Area 79,000
ft2
Annual Production 120
pieces
Production Hrs. Annual 6,917
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $65,635 1,551,750
kWh
Electricity Demand $45,730 5,775
kW-mo/yr
Electricity Fees $4,148 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $26,655 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $24,797

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Water Disposal Savings Solid Waste (non-haz) Savings
01 2.7135: Install occupancy sensors $605 $74 $416
51,057
kWh
$166
-
kW-mo/yr
$23 - -
02 2.3212: Optimize plant power factor $9,873 $10,440 - $9,493
-
kW-mo/yr
$380 - -
03 2.7111: Reduce illumination to minimum necessary levels $1,253 - $201
24,647
kWh
$1,004
-
kW-mo/yr
$48 - -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $12,892 $2,400 $12,396
1,522,808
kWh
- $496 - -
05 3.5311: Recover and reuse waste material $552 - - - - - $552
-
lb
06 2.8114: Change rate schedules or other changes in utility service $1,480 - - - - $1,480
-
Tgal
-
TOTAL RECOMMENDED $26,655 $12,914 $13,013
1,598,512
kWh
$10,663
-
kW-mo/yr
$947 $1,480
-
Tgal
$552
-
lb
TOTAL IMPLEMENTED $24,797 $12,840 $12,396
1,522,808
kWh
$9,493
-
kW-mo/yr
$876 $1,480
-
Tgal
$552
-
lb
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Water Disposal Savings Solid Waste (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs