ITAC Assessment: LL0109
ITAC logo
ITAC Assessment: LL0109
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product Offshore drilling completion equipment
NAICS
n/a
SIC 3533: Oil and Gas Field Machinery and Equipment
Sales Range $10
M
to 50
M
# of Employees 94
Plant Area 45,600
ft2
Annual Production 20,000,000
lb
Production Hrs. Annual 5,200
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $193,878 2,506,650
kWh
Electricity Demand $41,672 7,392
kW-mo/yr
Electricity Fees $(-28,338.0) -
Natural Gas $7,004 598
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $47,858 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $19,588

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Water Disposal Savings Solid Waste (non-haz) Savings
01 2.3212: Optimize plant power factor $6,070 $8,640 - $5,837
-
kW-mo/yr
$233 - -
02 2.7134: Use photocell controls $6,866 $325 $4,854
67,392
kWh
$1,748
-
kW-mo/yr
$264 - -
03 2.7111: Reduce illumination to minimum necessary levels $5,657 $82 $4,450
61,776
kWh
$989
-
kW-mo/yr
$218 - -
04 2.4321: Upgrade obsolete equipment $441 $180 $424
5,887
kWh
- $17 - -
05 2.8123: Pay utility bills on time $296 - - - $296 - -
06 3.5313: Increase amount of waste recovered for resale $18,851 - - - - - $18,851
-
lb
07 3.4133: Clean fouling from water lines regularly $9,677 $2,200 - - - $9,677
-
Tgal
-
TOTAL RECOMMENDED $47,858 $11,427 $9,728
135,055
kWh
$8,574
-
kW-mo/yr
$1,028 $9,677
-
Tgal
$18,851
-
lb
TOTAL IMPLEMENTED $19,588 $180 $424
5,887
kWh
- $313 - $18,851
-
lb
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Water Disposal Savings Solid Waste (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs