ITAC Assessment: LL0106
ITAC logo
ITAC Assessment: LL0106
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product Dairy Product
NAICS
n/a
SIC 2020:
Sales Range $10
M
to 50
M
# of Employees 28
Plant Area 72,000
ft2
Annual Production 0
units
Production Hrs. Annual 4,160
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $81,119 1,918,360
kWh
Electricity Demand $24,945 3,176
kW-mo/yr
Electricity Fees $2,934 -
Natural Gas $310,100 46,498
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $57,787 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $42,437

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Water Disposal Savings Solid Waste (non-haz) Savings Primary Product Savings
01 2.3212: Optimize plant power factor $2,493 $2,532 - $2,397
-
kW-mo/yr
$96 - - - -
02 2.2511: Insulate bare equipment $2,835 $5,442 - - - $2,835
-
MMBtu
- - -
03 2.7111: Reduce illumination to minimum necessary levels $7,281 $240 $5,446
87,552
kWh
$1,555
-
kW-mo/yr
$280 - - - -
04 2.1133: Adjust burners for efficient operation $19,278 $18,290 - - - $19,278
-
MMBtu
- - -
05 2.8114: Change rate schedules or other changes in utility service $1,200 - - - - - $1,200
-
Tgal
- -
06 3.5313: Increase amount of waste recovered for resale $9,350 - - - - - - $9,350
-
lb
-
07 4.423: Move product using mechanical means $15,350 $1,210 - - - - - - $15,350
TOTAL RECOMMENDED $57,787 $27,714 $5,446
87,552
kWh
$3,952
-
kW-mo/yr
$376 $22,113
-
MMBtu
$1,200
-
Tgal
$9,350
-
lb
$15,350
TOTAL IMPLEMENTED $42,437 $26,504 $5,446
87,552
kWh
$3,952
-
kW-mo/yr
$376 $22,113
-
MMBtu
$1,200
-
Tgal
$9,350
-
lb
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Water Disposal Savings Solid Waste (non-haz) Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs