ITAC Assessment: LL0105
ITAC logo
ITAC Assessment: LL0105
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product Pickled fruits and vegetables, vegatable sauces, and salad d
NAICS
n/a
SIC 2035: Pickled Fruits and Vegetables, Vegetable Sauces and Seasonings, and Salad Dressings
Sales Range $10
M
to 50
M
# of Employees 94
Plant Area 180,000
ft2
Annual Production 0
pieces
Production Hrs. Annual 4,000
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $192,285 2,727,000
kWh
Electricity Demand $53,665 9,549
kW-mo/yr
Electricity Fees $(-37,969.0) -
Natural Gas $27,556 9,787
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $21,890 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $14,876

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 2.7111: Reduce illumination to minimum necessary levels $6,586 $630 $4,889
100,072
kWh
$1,444
-
kW-mo/yr
$253 -
02 2.7135: Install occupancy sensors $2,098 $185 $1,792
36,689
kWh
$225
-
kW-mo/yr
$81 -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $4,896 $9,912 $3,635
74,405
kWh
$1,073
-
kW-mo/yr
$188 -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,296 $600 - - - $1,296
-
MMBtu
05 2.3137: Use power during off-peak periods $7,014 $24,388 - $7,014
-
kW-mo/yr
- -
TOTAL RECOMMENDED $21,890 $35,715 $10,316
211,166
kWh
$9,756
-
kW-mo/yr
$522 $1,296
-
MMBtu
TOTAL IMPLEMENTED $14,876 $11,327 $10,316
211,166
kWh
$2,742
-
kW-mo/yr
$522 $1,296
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs