Assessment Year | 2001 |
---|---|
Principal Product | metal fab |
NAICS |
n/a
|
SIC | 3499: Fabricated Metal Products, Not Elsewhere Classified |
Sales Range | $1 M to 5M |
# of Employees | 45 |
Plant Area |
30,000
ft2
|
Annual Production | 1,000,000
pieces
|
Production Hrs. Annual | 3,666
hrs
|
Location (State) | Louisiana |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $47,572 | 683,920 |
kWh
|
$0.070 |
Electricity Demand | $14,872 | 2,974 |
kW-mo/yr
|
$5.00 |
Electricity Fees | $1,903 | - |
|
- |
Natural Gas | $410 | 33 |
MMBtu
|
$12.42 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $5,153 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $2,189 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Solid Waste (non-haz) Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $646 | $854 |
$480
9,371
kWh
|
$141
-
kW-mo/yr
|
$25 | - | |
02 | 2.3212: Optimize plant power factor | $478 | $1,200 | - |
$478
-
kW-mo/yr
|
- | - | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,840 | $6,234 |
$1,459
28,780
kWh
|
$310
-
kW-mo/yr
|
$71 | - | |
04 | 2.7491: Insulate glazing, walls, ceilings, and roofs | $153 | $268 |
$153
2,989
kWh
|
- | - | - | |
05 | 2.7491: Insulate glazing, walls, ceilings, and roofs | $248 | $424 |
$248
4,848
kWh
|
- | - | - | |
06 | 3.1192: Reduce scrap production | $1,788 | - | - | - | - |
$1,788
-
lb
|
|
TOTAL RECOMMENDED | $5,153 | $8,980 |
$2,340
45,988
kWh
|
$929
-
kW-mo/yr
|
$96 |
$1,788
-
lb
|
||
TOTAL IMPLEMENTED | $2,189 | $692 |
$401
7,837
kWh
|
- | - |
$1,788
-
lb
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Solid Waste (non-haz) Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs