ITAC Assessment: LL0101
ITAC logo
ITAC Assessment: LL0101
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product metal fab
NAICS
n/a
SIC 3499: Fabricated Metal Products, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 45
Plant Area 30,000
ft2
Annual Production 1,000,000
pieces
Production Hrs. Annual 3,666
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $47,572 683,920
kWh
Electricity Demand $14,872 2,974
kW-mo/yr
Electricity Fees $1,903 -
Natural Gas $410 33
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $5,153 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,189

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Solid Waste (non-haz) Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $646 $854 $480
9,371
kWh
$141
-
kW-mo/yr
$25 -
02 2.3212: Optimize plant power factor $478 $1,200 - $478
-
kW-mo/yr
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $1,840 $6,234 $1,459
28,780
kWh
$310
-
kW-mo/yr
$71 -
04 2.7491: Insulate glazing, walls, ceilings, and roofs $153 $268 $153
2,989
kWh
- - -
05 2.7491: Insulate glazing, walls, ceilings, and roofs $248 $424 $248
4,848
kWh
- - -
06 3.1192: Reduce scrap production $1,788 - - - - $1,788
-
lb
TOTAL RECOMMENDED $5,153 $8,980 $2,340
45,988
kWh
$929
-
kW-mo/yr
$96 $1,788
-
lb
TOTAL IMPLEMENTED $2,189 $692 $401
7,837
kWh
- - $1,788
-
lb
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Solid Waste (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs