ITAC Assessment: LE0602
ITAC logo
ITAC Assessment: LE0602
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Implants for spinal and joint surgeries
NAICS 339112: Surgical and Medical Instrument Manufacturing
SIC 3842: Orthopedic, Prosthetic, and Surgical Appliances and Supplies
Sales Range $10
M
to 50
M
# of Employees 167
Plant Area 58,500
ft2
Annual Production 550,000
pieces
Production Hrs. Annual 4,160
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $157,286 2,259,600
kWh
Electricity Demand $46,169 4,432
kW-mo/yr
Electricity Fees $47,905 -
Natural Gas $6,005 536
MMBtu
TOTAL YEARLY COSTS $257,365
RECOMMENDED SAVINGS* $148,276 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Increase in Production Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $2,126 - $1,761
25,160
kWh
$365
-
kW-mo/yr
-
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $23,570 $6,000 $19,569
279,552
kWh
$4,001
-
kW-mo/yr
-
03 2.4321: Upgrade obsolete equipment $93,000 $55,000 - - $93,000
04 2.3131: Reschedule plant operations or reduce load to avoid peaks $7,505 $7,324 $6,231
89,020
kWh
$1,274
-
kW-mo/yr
-
05 2.7232: Replace existing hvac unit with high efficiency model $22,075 $96,862 $18,328
261,834
kWh
$3,747
-
kW-mo/yr
-
TOTAL RECOMMENDED $148,276 $165,186 $45,889
655,566
kWh
$9,387
-
kW-mo/yr
$93,000
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs