Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Fiber Optical Connectors
NAICS 334417: Electronic Connector Manufacturing
SIC 3678: Electronic Connectors
Sales Range $10
M
to 50
M
# of Employees 80
Plant Area 90,000
ft2
Annual Production 100,000
pieces
Production Hrs. Annual 2,340
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $286,822 4,975,229
kWh
Electricity Demand $83,828 11,002
kW-mo/yr
Electricity Fees $5,914 -
Natural Gas $675 53
MMBtu
TOTAL YEARLY COSTS $377,239
RECOMMENDED SAVINGS* $88,202 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
01 2.7261: Install timers and/or thermostats $36,732 $3,600 $36,732
633,303
kWh
- - -
02 2.7135: Install occupancy sensors $1,709 $3,000 $1,709
29,465
kWh
- - -
03 2.1311: Replace electrically-operated equipment with fossil fuel equipment $44,903 $88,000 $109,064
1,880,424
kWh
- $(-91,251.0)
-
MMBtu
$27,090
04 2.7142: Utilize higher efficiency lamps and/or ballasts $4,858 $32,631 $3,250
56,035
kWh
$1,608
-
kW-mo/yr
- -
TOTAL RECOMMENDED $88,202 $127,231 $150,755
2,599,227
kWh
$1,608
-
kW-mo/yr
$(-91,251.0)
-
MMBtu
$27,090
TOTAL IMPLEMENTED - - - - - -