ITAC Assessment: LE0551
ITAC logo
ITAC Assessment: LE0551
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Packaged Meats
NAICS 311612: Meat Processed from Carcasses
SIC 2013: Sausages and Other Prepared Meat Products
Sales Range $10
M
to 50
M
# of Employees 70
Plant Area 144,000
ft2
Annual Production 9,000,000
lb
Production Hrs. Annual 2,600
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $267,432 4,052,000
kWh
Electricity Demand $43,200 9,449
kW-mo/yr
Electricity Fees $5,074 -
Natural Gas $130,071 23,227
MMBtu
Waste Disposal Costs
Water Usage $200,260 3,230
Tgal
TOTAL YEARLY COSTS $646,037
RECOMMENDED SAVINGS* $181,310 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $181,107

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Water Usage Savings
01 3.4116: Meter recycled water (to reduce sewer charges) $69,768 $5,000 - - $69,768
-
Tgal
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $203 $300 $186
2,827
kWh
$17
-
kW-mo/yr
-
03 2.9121: Install wind powered electric generator $111,339 $525,000 $111,339
752,051
kWh
- -
TOTAL RECOMMENDED $181,310 $530,300 $111,525
754,878
kWh
$17
-
kW-mo/yr
$69,768
-
Tgal
TOTAL IMPLEMENTED $181,107 $530,000 $111,339
752,051
kWh
- $69,768
-
Tgal
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs