Assessment Year | 2022 |
---|---|
Principal Product | Aluminium powder |
NAICS | 339999: All Other Miscellaneous Manufacturing |
SIC | 3399: Primary Metal Products, Not Elsewhere Classified |
Sales Range | $50 M to 100M |
# of Employees | 45 |
Plant Area |
150,000
ft2
|
Annual Production | 39,000,000
lb
|
Production Hrs. Annual | 8,756
hrs
|
Location (State) | Pennsylvania |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $499,143 | 9,132,300 |
kWh
|
$0.055 |
Electricity Demand | $53,054 | 21,354 |
kW-mo/yr
|
$2.48 |
Electricity Fees | $10,314 | - |
|
- |
Natural Gas | $355,109 | 78,328 |
MMBtu
|
$4.53 |
TOTAL YEARLY COSTS | $917,620 | |||
RECOMMENDED SAVINGS* | $378,060 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Primary Product Savings | By-product Production Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $8,826 | $6,362 |
$8,204
149,167
kWh
|
$622
-
kW-mo/yr
|
- | - | - | |
02 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $684 | $780 |
$645
11,731
kWh
|
$39
-
kW-mo/yr
|
- | - | - | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,728 | $2,200 |
$1,629
29,617
kWh
|
$99
-
kW-mo/yr
|
- | - | - | |
04 | 2.4321: Upgrade obsolete equipment | $246,141 | $750,000 | - | - |
$16,141
-
MMBtu
|
$130,000 | $100,000 | |
05 | 2.2442: Preheat combustion air with waste heat | $44,811 | $140,000 | - | - |
$44,811
-
MMBtu
|
- | - | |
06 | 2.4226: Use / purchase optimum sized compressor | $75,870 | $448,000 |
$71,453
1,299,152
kWh
|
$4,417
-
kW-mo/yr
|
- | - | - | |
TOTAL RECOMMENDED | $378,060 | $1,347,342 |
$81,931
1,489,667
kWh
|
$5,177
-
kW-mo/yr
|
$60,952
-
MMBtu
|
$130,000 | $100,000 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Primary Product Savings | By-product Production Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs