ITAC Assessment: LE0533
ITAC logo
ITAC Assessment: LE0533
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Mechanical Assemblies
NAICS 332710: Machine Shops
SIC 3599: Industrial and Commercial Machinery and Equipment, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 80
Plant Area 120,000
ft2
Annual Production 15,000
units
Production Hrs. Annual 4,680
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $32,593 544,116
kWh
Electricity Demand $15,906 1,865
kW-mo/yr
Electricity Fees $8,329 -
LPG $32,390 1,564
MMBtu
Fuel Oil #2 $7,333 357
MMBtu
Waste Disposal Costs
Water Usage $11,111 597
Tgal
TOTAL YEARLY COSTS $107,662
RECOMMENDED SAVINGS* $62,858 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings LPG Savings Fuel Oil #2 Savings One-time Revenue or Avoided Cost Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $6,161 $4,100 - - $6,161
-
MMBtu
- -
02 2.7231: Use radiant heater for spot heating $3,206 $3,500 - - - $3,206
-
MMBtu
-
03 4.652: Replace existing equipment with more suitable substitutes $21,231 $50,000 - - - - $21,231
04 2.1331: Burn a less expensive grade of fuel $24,359 $62,500 - - - - $24,359
05 2.7232: Replace existing hvac unit with high efficiency model $5,998 $18,621 - - $5,998
-
MMBtu
- -
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $1,903 $6,154 $1,394
23,275
kWh
$509
-
kW-mo/yr
- - -
TOTAL RECOMMENDED $62,858 $144,875 $1,394
23,275
kWh
$509
-
kW-mo/yr
$12,159
-
MMBtu
$3,206
-
MMBtu
$45,590
TOTAL IMPLEMENTED - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings LPG Savings Fuel Oil #2 Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs