Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product corrosion inhibitors and tannin stain inhibitors
NAICS 325510: Paint and Coating Manufacturing
SIC 2851: Paints, Varnishes, Lacquers, Enamels, and Allied Products
Sales Range $5
M
to 10
M
# of Employees 15
Plant Area 32,400
ft2
Annual Production 10,000,000
lb
Production Hrs. Annual 5,100
hrs
Location (State) Indiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $659,564 12,686,400
kWh
Electricity Demand $225,211 22,417
kW-mo/yr
Electricity Fees $(-116,436.0) -
Natural Gas $136,555 22,715
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $10,842 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $6,628

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Administrative Changes Savings
01 2.2113: Repair or replace steam traps $1,701 $638 - - $1,701
-
MMBtu
- -
02 2.2136: Install / repair insulation on steam lines $3,038 $1,315 - - $3,038
-
MMBtu
- -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,889 $1,265 $1,478
47,442
kWh
$411
-
kW-mo/yr
- - -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $3,000 $11,805 $1,426
27,445
kWh
$928
-
kW-mo/yr
- $84 $562
05 2.7142: Utilize higher efficiency lamps and/or ballasts $466 $1,428 $197
3,785
kWh
$50
-
kW-mo/yr
- $99 $120
06 2.7135: Install occupancy sensors $748 $2,287 $678
13,040
kWh
$70
-
kW-mo/yr
- - -
TOTAL RECOMMENDED $10,842 $18,738 $3,779
91,712
kWh
$1,459
-
kW-mo/yr
$4,739
-
MMBtu
$183 $682
TOTAL IMPLEMENTED $6,628 $3,218 $1,478
47,442
kWh
$411
-
kW-mo/yr
$4,739
-
MMBtu
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs