Assessment Year | 2022 |
---|---|
Principal Product | SHIPS |
NAICS | 336611: Ship Building and Repairing |
SIC | 3731: Ship Building and Repairing |
Sales Range | $100 M to 500M |
# of Employees | 600 |
Plant Area |
2,000,000
ft2
|
Annual Production | 3
pieces
|
Production Hrs. Annual | 8,736
hrs
|
Location (State) | Pennsylvania |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $1,956,196 | 18,840,339 |
kWh
|
$0.10 |
Electricity Demand | $64,975 | 48,116 |
kW-mo/yr
|
$1.35 |
Electricity Fees | $5,718 | - |
|
- |
TOTAL YEARLY COSTS | $2,026,889 | |||
RECOMMENDED SAVINGS* | $691,537 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings |
---|---|---|---|---|---|---|
01 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $130,874 | $22,000 |
$124,590
1,197,988
kWh
|
$6,284
-
kW-mo/yr
|
|
02 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $84,178 | $47,500 |
$78,314
753,021
kWh
|
$5,864
-
kW-mo/yr
|
|
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $330,596 | $199,875 |
$324,805
3,123,120
kWh
|
$5,791
-
kW-mo/yr
|
|
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $49,409 | $33,000 |
$48,546
466,792
kWh
|
$863
-
kW-mo/yr
|
|
05 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $8,036 | $10,414 |
$7,746
74,481
kWh
|
$290
-
kW-mo/yr
|
|
06 | 2.7232: Replace existing hvac unit with high efficiency model | $88,444 | $135,000 |
$87,818
844,405
kWh
|
$626
-
kW-mo/yr
|
|
TOTAL RECOMMENDED | $691,537 | $447,789 |
$671,819
6,459,807
kWh
|
$19,718
-
kW-mo/yr
|
||
TOTAL IMPLEMENTED | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs