ITAC Assessment: LE0529
ITAC logo
ITAC Assessment: LE0529
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Adhesives
NAICS 325520: Adhesive Manufacturing
SIC 2891: Adhesives and Sealants
Sales Range $10
M
to 50
M
# of Employees 40
Plant Area 80,000
ft2
Annual Production 100,000
units
Production Hrs. Annual 2,210
hrs
Location (State) New Jersey

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $103,578 1,032,293
kWh
Electricity Demand $23,443 3,786
kW-mo/yr
Electricity Fees $14,713 -
Natural Gas $22,749 1,845
MMBtu
TOTAL YEARLY COSTS $164,483
RECOMMENDED SAVINGS* $146,325 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $145,598

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
01 2.6218: Turn off equipment when not in use $727 - $187
1,871
kWh
$153
-
kW-mo/yr
$387
-
MMBtu
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $6,841 $6,763 $5,252
52,510
kWh
$1,589
-
kW-mo/yr
- -
03 2.7232: Replace existing hvac unit with high efficiency model $20,316 $89,649 $18,970
189,696
kWh
$1,346
-
kW-mo/yr
- -
04 2.9114: Use solar heat to make electricty $118,441 $791,800 $59,241
592,406
kWh
- - $59,200
TOTAL RECOMMENDED $146,325 $888,212 $83,650
836,483
kWh
$3,088
-
kW-mo/yr
$387
-
MMBtu
$59,200
TOTAL IMPLEMENTED $145,598 $888,212 $83,463
834,612
kWh
$2,935
-
kW-mo/yr
- $59,200
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs