ITAC Assessment: LE0522
ITAC logo
ITAC Assessment: LE0522
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Door Frames
NAICS 332321: Metal Window and Door Manufacturing
SIC 3442: Metal Doors, Sash, Frames, Molding, and Trim Manufacturing
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area 100,000
ft2
Annual Production 100,000
units
Production Hrs. Annual 4,680
hrs
Location (State) New Jersey

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $18,758 382,810
kWh
Electricity Demand $29,753 4,647
kW-mo/yr
Electricity Fees $15,679 -
Natural Gas $80,397 8,730
MMBtu
TOTAL YEARLY COSTS $144,587
RECOMMENDED SAVINGS* $19,307 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $335 $35 $252
5,134
kWh
$83
-
kW-mo/yr
-
02 2.6125: Keep equipment clean $1,947 $1,161 $1,947
39,744
kWh
- -
03 2.2437: Recover waste heat from equipment $1,971 $1,200 - - $1,971
-
MMBtu
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,261 $2,600 $2,442
49,859
kWh
$819
-
kW-mo/yr
-
05 2.7233: Use properly designed and sized hvac equipment $5,028 $7,400 - - $5,028
-
MMBtu
06 2.7142: Utilize higher efficiency lamps and/or ballasts $2,085 $4,448 $1,624
33,140
kWh
$461
-
kW-mo/yr
-
07 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $4,680 $12,720 $4,680
95,497
kWh
- -
TOTAL RECOMMENDED $19,307 $29,564 $10,945
223,374
kWh
$1,363
-
kW-mo/yr
$6,999
-
MMBtu
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs