ITAC Assessment: LE0507
ITAC logo
ITAC Assessment: LE0507
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2021
Principal Product Electronic Connectors
NAICS 334417: Electronic Connector Manufacturing
SIC 3678: Electronic Connectors
Sales Range $10
M
to 50
M
# of Employees 20
Plant Area 42,000
ft2
Annual Production 50,000,000
pieces
Production Hrs. Annual 8,736
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $113,367 1,750,204
kWh
Electricity Demand $19,924 3,894
kW-mo/yr
Electricity Fees $3,112 -
TOTAL YEARLY COSTS $136,403
RECOMMENDED SAVINGS* $20,872 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $746 $40 $674
10,499
kWh
$72
-
kW-mo/yr
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $6,952 $14,000 $6,266
97,913
kWh
$686
-
kW-mo/yr
03 2.7142: Utilize higher efficiency lamps and/or ballasts $8,002 $32,400 $6,230
97,344
kWh
$1,772
-
kW-mo/yr
04 2.7232: Replace existing hvac unit with high efficiency model $5,172 $24,000 $4,752
74,256
kWh
$420
-
kW-mo/yr
TOTAL RECOMMENDED $20,872 $70,440 $17,922
280,012
kWh
$2,950
-
kW-mo/yr
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs