Assessment Year | 2020 |
---|---|
Principal Product | Beverages |
NAICS | 312120: Breweries |
SIC | 2082: Malt Beverages |
Sales Range | $10 M to 50M |
# of Employees | 100 |
Plant Area |
100,000
ft2
|
Annual Production | 4,280
Tgal
|
Production Hrs. Annual | 8,112
hrs
|
Location (State) | Pennsylvania |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $306,970 | 5,059,000 |
kWh
|
$0.061 |
Electricity Demand | $45,576 | 11,438 |
kW-mo/yr
|
$3.98 |
Electricity Fees | $6,246 | - |
|
- |
Natural Gas | $93,317 | 16,344 |
MMBtu
|
$5.71 |
TOTAL YEARLY COSTS | $452,109 | |||
RECOMMENDED SAVINGS* | $42,069 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $23,680 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,924 | $40 |
$1,765
28,929
kWh
|
$159
-
kW-mo/yr
|
- | |
02 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $4,376 | $10,000 |
$5,481
89,856
kWh
|
$1,030
-
kW-mo/yr
|
$(-2,135.0)
-
MMBtu
|
|
03 | 2.2449: Recover heat from exhausted steam, hot air or hot water | $5,008 | $12,000 | - | - |
$5,008
-
MMBtu
|
|
04 | 2.2437: Recover waste heat from equipment | $1,370 | $4,000 | - | - |
$1,370
-
MMBtu
|
|
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,681 | $5,750 |
$1,534
25,147
kWh
|
$147
-
kW-mo/yr
|
- | |
06 | 2.7232: Replace existing hvac unit with high efficiency model | $15,572 | $60,000 |
$14,060
230,491
kWh
|
$1,512
-
kW-mo/yr
|
- | |
07 | 2.2442: Preheat combustion air with waste heat | $9,005 | $35,000 | - | - |
$9,005
-
MMBtu
|
|
08 | 2.7232: Replace existing hvac unit with high efficiency model | $3,133 | $15,000 |
$2,655
43,520
kWh
|
$478
-
kW-mo/yr
|
- | |
TOTAL RECOMMENDED | $42,069 | $141,790 |
$25,495
417,943
kWh
|
$3,326
-
kW-mo/yr
|
$13,248
-
MMBtu
|
||
TOTAL IMPLEMENTED | $23,680 | $84,790 |
$20,014
328,087
kWh
|
$2,296
-
kW-mo/yr
|
$1,370
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs