Assessment Year | 2019 |
---|---|
Principal Product | Refrigeration Machines |
NAICS | 333415: Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipmen |
SIC | 3585: Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipment |
Sales Range | $10 M to 50M |
# of Employees | 100 |
Plant Area |
150,000
ft2
|
Annual Production | 30
units
|
Production Hrs. Annual | 5,712
hrs
|
Location (State) | Pennsylvania |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $419,653 | 7,089,562 |
kWh
|
$0.059 |
Electricity Demand | $21,923 | 8,769 |
kW-mo/yr
|
$2.50 |
Electricity Fees | $15,455 | - |
|
- |
Natural Gas | $255,805 | 48,265 |
MMBtu
|
$5.30 |
TOTAL YEARLY COSTS | $712,836 | |||
RECOMMENDED SAVINGS* | $55,058 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $25,624 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | One-time Revenue or Avoided Cost Savings |
---|---|---|---|---|---|---|---|
01 | 2.6212: Turn off equipment during breaks, reduce operating time | $9,091 | - |
$9,047
153,342
kWh
|
$44
-
kW-mo/yr
|
- | |
02 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $179 | $80 |
$161
2,737
kWh
|
$18
-
kW-mo/yr
|
- | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $20,343 | $40,000 |
$19,225
325,853
kWh
|
$1,118
-
kW-mo/yr
|
- | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,531 | $5,300 |
$1,175
19,918
kWh
|
$138
-
kW-mo/yr
|
$218 | |
05 | 2.7232: Replace existing hvac unit with high efficiency model | $23,914 | $96,000 |
$20,359
345,072
kWh
|
$3,555
-
kW-mo/yr
|
- | |
TOTAL RECOMMENDED | $55,058 | $141,380 |
$49,967
846,922
kWh
|
$4,873
-
kW-mo/yr
|
$218 | ||
TOTAL IMPLEMENTED | $25,624 | $101,380 |
$21,695
367,727
kWh
|
$3,711
-
kW-mo/yr
|
$218 |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs