| Assessment Year | 2019 |
|---|---|
| Principal Product | Refrigeration Machines |
| NAICS | 333415: Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipmen |
| SIC | 3585: Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipment |
| Sales Range | $10 M to 50M |
| # of Employees | 100 |
| Plant Area |
150,000
ft2
|
| Annual Production | 30
units
|
| Production Hrs. Annual | 5,712
hrs
|
| Location (State) | Pennsylvania |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $419,653 | 7,089,562 |
kWh
|
$0.059 |
| Electricity Demand | $21,923 | 8,769 |
kW-mo/yr
|
$2.50 |
| Electricity Fees | $15,455 | - |
|
- |
| Natural Gas | $255,805 | 48,265 |
MMBtu
|
$5.30 |
| TOTAL YEARLY COSTS | $712,836 | |||
| RECOMMENDED SAVINGS* | $55,058 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $25,624 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | One-time Revenue or Avoided Cost Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.6212: Turn off equipment during breaks, reduce operating time | $9,091 | - |
$9,047
153,342
kWh
|
$44
-
kW-mo/yr
|
- | |
| 02 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $179 | $80 |
$161
2,737
kWh
|
$18
-
kW-mo/yr
|
- | |
| 03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $20,343 | $40,000 |
$19,225
325,853
kWh
|
$1,118
-
kW-mo/yr
|
- | |
| 04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,531 | $5,300 |
$1,175
19,918
kWh
|
$138
-
kW-mo/yr
|
$218 | |
| 05 | 2.7232: Replace existing hvac unit with high efficiency model | $23,914 | $96,000 |
$20,359
345,072
kWh
|
$3,555
-
kW-mo/yr
|
- | |
| TOTAL RECOMMENDED | $55,058 | $141,380 |
$49,967
846,922
kWh
|
$4,873
-
kW-mo/yr
|
$218 | ||
| TOTAL IMPLEMENTED | $25,624 | $101,380 |
$21,695
367,727
kWh
|
$3,711
-
kW-mo/yr
|
$218 | ||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs