Assessment Year | 2017 |
---|---|
Principal Product | Envelope |
NAICS | 322230: Stationery Product Manufacturing |
SIC | 2677: Envelopes |
Sales Range | $10 M to 50M |
# of Employees | 90 |
Plant Area |
135,000
ft2
|
Annual Production | 500,000,000
pieces
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | Pennsylvania |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $133,005 | 1,731,900 |
kWh
|
$0.077 |
Electricity Demand | $22,682 | 5,509 |
kW-mo/yr
|
$4.12 |
Electricity Fees | $4,940 | - |
|
- |
Natural Gas | $6,533 | 928 |
MMBtu
|
$7.04 |
TOTAL YEARLY COSTS | $167,160 | |||
RECOMMENDED SAVINGS* | $25,231 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $24,045 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings |
---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $4,735 | $1,000 |
$4,294
55,751
kWh
|
$441
-
kW-mo/yr
|
|
02 | 2.4221: Install compressor air intakes in coolest locations | $2,286 | $1,200 |
$2,039
26,478
kWh
|
$247
-
kW-mo/yr
|
|
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $12,823 | $14,438 |
$11,628
151,008
kWh
|
$1,195
-
kW-mo/yr
|
|
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,621 | $5,775 |
$2,378
30,888
kWh
|
$243
-
kW-mo/yr
|
|
05 | 2.2437: Recover waste heat from equipment | $1,580 | $3,500 |
$1,432
18,595
kWh
|
$148
-
kW-mo/yr
|
|
06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,186 | $5,500 |
$1,075
13,965
kWh
|
$111
-
kW-mo/yr
|
|
TOTAL RECOMMENDED | $25,231 | $31,413 |
$22,846
296,685
kWh
|
$2,385
-
kW-mo/yr
|
||
TOTAL IMPLEMENTED | $24,045 | $25,913 |
$21,771
282,720
kWh
|
$2,274
-
kW-mo/yr
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs