ITAC Assessment: LE0426
ITAC logo
ITAC Assessment: LE0426
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2016
Principal Product Metal Enclosure
NAICS 332322: Sheet Metal Work Manufacturing
SIC 3444: Sheet Metal Work
Sales Range $100
M
to 500
M
# of Employees 174
Plant Area 417,742
ft2
Annual Production 16,000,000
lb
Production Hrs. Annual 6,240
hrs
Location (State) New Jersey

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $500,266 6,614,263
kWh
Electricity Demand $85,080 16,530
kW-mo/yr
Electricity Fees $92,886 -
Natural Gas $153,642 23,656
MMBtu
TOTAL YEARLY COSTS $831,874
RECOMMENDED SAVINGS* $157,057 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $27,917

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Primary Product Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $13,840 $1,000 $12,660
166,600
kWh
$1,180
-
kW-mo/yr
- -
02 2.2437: Recover waste heat from equipment $5,562 $2,000 - - $5,562
-
MMBtu
-
03 2.7314: Reduce ventilation air $102,120 $52,500 $2,120
27,893
kWh
- - $100,000
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,322 $780 $1,167
15,362
kWh
$155
-
kW-mo/yr
- -
05 2.7135: Install occupancy sensors $3,070 $3,000 $3,070
40,395
kWh
- - -
06 2.2614: Use cooling tower or economizer to replace chiller cooling $16,120 $35,000 $13,339
175,519
kWh
$2,781
-
kW-mo/yr
- -
07 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $7,376 $16,500 $6,171
81,199
kWh
$1,205
-
kW-mo/yr
- -
08 2.7135: Install occupancy sensors $454 $1,300 $454
5,975
kWh
- - -
09 2.7142: Utilize higher efficiency lamps and/or ballasts $4,579 $13,747 $3,745
49,271
kWh
$834
-
kW-mo/yr
- -
10 2.7142: Utilize higher efficiency lamps and/or ballasts $179 $780 $143
1,887
kWh
$36
-
kW-mo/yr
- -
11 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,435 $12,000 $2,229
29,327
kWh
$206
-
kW-mo/yr
- -
TOTAL RECOMMENDED $157,057 $138,607 $45,098
593,428
kWh
$6,397
-
kW-mo/yr
$5,562
-
MMBtu
$100,000
TOTAL IMPLEMENTED $27,917 $30,307 $19,944
262,447
kWh
$2,411
-
kW-mo/yr
$5,562
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs