ITAC Assessment: LE0424
ITAC logo
ITAC Assessment: LE0424
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2016
Principal Product Printed Polyethylene Bags
NAICS 323111: Commercial Printing (except Screen and Books)
SIC 2759: Commercial Printing, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 120
Plant Area 85,000
ft2
Annual Production 485,000,000
units
Production Hrs. Annual 8,736
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $381,789 6,521,237
kWh
Electricity Demand $44,703 11,477
kW-mo/yr
Electricity Fees $24,551 -
Natural Gas $136,090 19,861
MMBtu
TOTAL YEARLY COSTS $587,133
RECOMMENDED SAVINGS* $18,565 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $16,980

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,742 $1,000 $4,349
73,706
kWh
$393
-
kW-mo/yr
- -
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $2,378 $600 $2,192
37,147
kWh
$186
-
kW-mo/yr
- -
03 2.2437: Recover waste heat from equipment $7,795 $2,750 - - $7,795
-
MMBtu
-
04 2.7135: Install occupancy sensors $825 $500 $825
13,978
kWh
- - -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $2,065 $3,420 $1,744
29,563
kWh
$160
-
kW-mo/yr
- $161
06 2.7142: Utilize higher efficiency lamps and/or ballasts $760 $3,440 $643
10,903
kWh
$117
-
kW-mo/yr
- -
TOTAL RECOMMENDED $18,565 $11,710 $9,753
165,297
kWh
$856
-
kW-mo/yr
$7,795
-
MMBtu
$161
TOTAL IMPLEMENTED $16,980 $7,770 $8,285
140,416
kWh
$739
-
kW-mo/yr
$7,795
-
MMBtu
$161
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs