Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2014
Principal Product Steel Drum
NAICS 326199: All Other Plastics Product Manufacturing
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 100
Plant Area 122,000
ft2
Annual Production 1,500,000
pieces
Production Hrs. Annual 2,600
hrs
Location (State) New Jersey

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $326,611 4,744,236
kWh
Electricity Demand $94,810 18,730
kW-mo/yr
Electricity Fees $143,183 -
Natural Gas $502,127 72,632
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $48,631 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $23,520

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Ancillary Material Cost Savings
01 2.1135: Repair furnaces and oven doors so that they seal efficiently $3,075 $660 - - $3,075
-
MMBtu
-
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,302 $1,000 $3,214
46,582
kWh
$1,088
-
kW-mo/yr
- -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,540 $1,000 $1,150
16,677
kWh
$390
-
kW-mo/yr
- -
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,662 $1,353 $1,229
17,805
kWh
$433
-
kW-mo/yr
- -
05 2.2442: Preheat combustion air with waste heat $5,797 $5,400 - - $5,797
-
MMBtu
-
06 2.2511: Insulate bare equipment $17,652 $17,399 - - $17,652
-
MMBtu
-
07 2.7142: Utilize higher efficiency lamps and/or ballasts $2,743 $5,800 $1,135
16,453
kWh
$275
-
kW-mo/yr
- $1,333
08 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $11,860 $36,800 $8,870
128,546
kWh
$2,990
-
kW-mo/yr
- -
TOTAL RECOMMENDED $48,631 $69,412 $15,598
226,063
kWh
$5,176
-
kW-mo/yr
$26,524
-
MMBtu
$1,333
TOTAL IMPLEMENTED $23,520 $45,260 $14,369
208,258
kWh
$4,743
-
kW-mo/yr
$3,075
-
MMBtu
$1,333
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs