ITAC Assessment: LE0369
ITAC logo
ITAC Assessment: LE0369
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2013
Principal Product Metal Tins
NAICS 332431: Metal Can Manufacturing
SIC 3411: Metal Cans
Sales Range $100
M
to 500
M
# of Employees 130
Plant Area 240,000
ft2
Annual Production 360,000,000
pieces
Production Hrs. Annual 5,616
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $244,708 5,715,900
kWh
Electricity Demand $34,228 16,092
kW-mo/yr
Electricity Fees $133,130 -
Natural Gas $344,317 52,150
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $137,282 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $134,415

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Ancillary Material Cost Savings
01 2.7135: Install occupancy sensors $8,050 $19,339 $7,331
170,493
kWh
$411
-
kW-mo/yr
$308
02 2.7142: Utilize higher efficiency lamps and/or ballasts $3,100 $14,365 $2,612
60,743
kWh
$277
-
kW-mo/yr
$211
03 2.7142: Utilize higher efficiency lamps and/or ballasts $2,867 $8,710 $2,342
54,475
kWh
$298
-
kW-mo/yr
$227
04 2.7142: Utilize higher efficiency lamps and/or ballasts $2,258 $7,350 $1,086
25,247
kWh
$26
-
kW-mo/yr
$1,146
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $50,065 $1,470 $41,903
974,486
kWh
$8,162
-
kW-mo/yr
-
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $50,836 $87,600 $47,098
1,095,304
kWh
$3,738
-
kW-mo/yr
-
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,083 $1,000 $1,930
44,894
kWh
$153
-
kW-mo/yr
-
08 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $18,023 $32,025 $16,696
388,268
kWh
$1,327
-
kW-mo/yr
-
TOTAL RECOMMENDED $137,282 $171,859 $120,998
2,813,910
kWh
$14,392
-
kW-mo/yr
$1,892
TOTAL IMPLEMENTED $134,415 $163,149 $118,656
2,759,435
kWh
$14,094
-
kW-mo/yr
$1,665
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs