Assessment Year | 2013 |
---|---|
Principal Product | Metal Parts |
NAICS | 332323: Ornamental and Architectural Metal Work Manufacturing |
SIC | 3446: Architectural and Ornamental Metal Work |
Sales Range | $10 M to 50M |
# of Employees | 18 |
Plant Area |
2,800
ft2
|
Annual Production | 200,000
units
|
Production Hrs. Annual | 2,340
hrs
|
Location (State) | Pennsylvania |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $266,635 | 3,626,668 |
kWh
|
$0.074 |
Electricity Fees | $117,023 | - |
|
- |
Natural Gas | $76,004 | 11,695 |
MMBtu
|
$6.50 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $32,690 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $2,414 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|
01 | 2.7135: Install occupancy sensors | $5,554 | $7,670 |
$4,696
63,457
kWh
|
- | $858 | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,145 | $9,935 |
$3,004
40,593
kWh
|
- | $141 | |
03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $15,554 | $4,768 |
$15,554
210,189
kWh
|
- | - | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,631 | $1,000 |
$2,631
35,560
kWh
|
- | - | |
05 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $2,414 | $2,750 |
$2,414
32,615
kWh
|
- | - | |
06 | 2.2615: Clean condenser tubes | $2,216 | $12,000 |
$2,216
29,948
kWh
|
- | - | |
07 | 2.1233: Analyze flue gas for proper air/fuel ratio | $1,176 | $1,000 | - |
$1,176
-
MMBtu
|
- | |
TOTAL RECOMMENDED | $32,690 | $39,123 |
$30,515
412,362
kWh
|
$1,176
-
MMBtu
|
$999 | ||
TOTAL IMPLEMENTED | $2,414 | $2,750 |
$2,414
32,615
kWh
|
- | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs