ITAC Assessment: LE0352
ITAC logo
ITAC Assessment: LE0352
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2013
Principal Product Metal Parts
NAICS 332323: Ornamental and Architectural Metal Work Manufacturing
SIC 3446: Architectural and Ornamental Metal Work
Sales Range $10
M
to 50
M
# of Employees 18
Plant Area 2,800
ft2
Annual Production 200,000
units
Production Hrs. Annual 2,340
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $266,635 3,626,668
kWh
Electricity Fees $117,023 -
Natural Gas $76,004 11,695
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $32,690 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,414

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Ancillary Material Cost Savings
01 2.7135: Install occupancy sensors $5,554 $7,670 $4,696
63,457
kWh
- $858
02 2.7142: Utilize higher efficiency lamps and/or ballasts $3,145 $9,935 $3,004
40,593
kWh
- $141
03 2.4231: Reduce the pressure of compressed air to the minimum required $15,554 $4,768 $15,554
210,189
kWh
- -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,631 $1,000 $2,631
35,560
kWh
- -
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $2,414 $2,750 $2,414
32,615
kWh
- -
06 2.2615: Clean condenser tubes $2,216 $12,000 $2,216
29,948
kWh
- -
07 2.1233: Analyze flue gas for proper air/fuel ratio $1,176 $1,000 - $1,176
-
MMBtu
-
TOTAL RECOMMENDED $32,690 $39,123 $30,515
412,362
kWh
$1,176
-
MMBtu
$999
TOTAL IMPLEMENTED $2,414 $2,750 $2,414
32,615
kWh
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs