ITAC Assessment: LE0343
ITAC logo
ITAC Assessment: LE0343
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2012
Principal Product Rooftop Membranes
NAICS 326113: Unlaminated Plastics Film and Sheet (except Packaging) Manufacturing
SIC 3081: Unsupported Plastics Film and Sheet
Sales Range $10
M
to 50
M
# of Employees 12
Plant Area 245,000
ft2
Annual Production 10,000
ton
Production Hrs. Annual 7,200
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $964,175 12,807,000
kWh
Electricity Demand $6,840 27,791
kW-mo/yr
Natural Gas $314,371 40,943
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $248,546 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.2614: Use cooling tower or economizer to replace chiller cooling $50,414 $67,000 $50,124
668,321
kWh
$290
-
kW-mo/yr
-
02 2.2622: Replace existing chiller with high efficiency model $167,678 $90,000 $166,752
2,223,360
kWh
$926
-
kW-mo/yr
-
03 2.2113: Repair or replace steam traps $14,506 $4,200 - - $14,506
-
MMBtu
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,536 $1,000 $4,511
60,148
kWh
$25
-
kW-mo/yr
-
05 2.7425: Clean or color roof to reduce solar load $1,380 $6,630 $1,380
18,393
kWh
- -
06 2.2442: Preheat combustion air with waste heat $3,932 $6,000 - - $3,932
-
MMBtu
07 2.1233: Analyze flue gas for proper air/fuel ratio $6,100 $16,000 - - $6,100
-
MMBtu
TOTAL RECOMMENDED $248,546 $190,830 $222,767
2,970,222
kWh
$1,241
-
kW-mo/yr
$24,538
-
MMBtu
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs