ITAC Assessment: LE0337
ITAC logo
ITAC Assessment: LE0337
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2012
Principal Product Custom Fabricated Products
NAICS 332312: Fabricated Structural Metal Manufacturing
SIC 3441: Fabricated Structural Metal
Sales Range $10
M
to 50
M
# of Employees 40
Plant Area 82,000
ft2
Annual Production 1
units
Production Hrs. Annual 5,200
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $157,264 1,175,020
kWh
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $91,120 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $54,631 $28,000 $54,631
407,697
kWh
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $17,684 $1,000 $17,684
131,967
kWh
03 2.7135: Install occupancy sensors $11,678 $19,140 $11,678
86,700
kWh
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,020 $1,562 $4,020
30,000
kWh
05 2.7232: Replace existing hvac unit with high efficiency model $3,107 $2,500 $3,107
23,190
kWh
TOTAL RECOMMENDED $91,120 $52,202 $91,120
679,554
kWh
TOTAL IMPLEMENTED - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs